Basis of Design Book 2 - City of St. Petersburg
Basis of Design Book 2 - City of St. Petersburg
Basis of Design Book 2 - City of St. Petersburg
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Richard Lee<br />
Superintendent/Quality Control - Crown and Pathways Construction<br />
Personal <strong>St</strong>ats<br />
34 years in the industry<br />
University <strong>of</strong> Florida<br />
B.S., Building Construction<br />
Highlighted Projects<br />
OSHA 30 Hour Certifications<br />
• Evacuation<br />
• Scaffold<br />
Maintenance <strong>of</strong> Traffic Certified (Florida<br />
Department <strong>of</strong> Transportation)<br />
Role and Expertise<br />
Rick is located on-site full-time during the construction phase and<br />
responsible for on-site activities. He supervises, sequences, coordinates<br />
and monitors all work to ensure that it is completed to the highest quality<br />
standards. Rick manages the day-to-day efforts <strong>of</strong> the subcontractor field<br />
staff to include all subcontractor meetings and pre-task planning. Also,<br />
he assumes a role in the pre-construction phase providing input and<br />
direction in the constructability reviews, logistics and safety planning.<br />
Rick ensures the jobsite is safe, clean and secure.<br />
“<br />
Growing up in the Tampa Bay Area has brought many<br />
opportunities my way. As I continue on my journey in construction<br />
I have had the pleasure to work on many iconic structures both in<br />
Tampa and <strong>St</strong>. Pete. These projects have had a pr<strong>of</strong>ound impact<br />
on the local economy and the skyline. Working on the Tropicana<br />
Field renovation was a great feeling knowing I helped the Rays get<br />
started. The Pier project is another chance to continue that tradition<br />
”<br />
and I look forward to the day we complete the Lens<br />
Additional Projects<br />
••<br />
Curtis Hixon Waterfront Park, Kiley Gardens Repair and Tampa<br />
Riverwalk ($21.6 million)<br />
••<br />
University <strong>of</strong> South Florida, Interdisciplinary Science Teaching &<br />
Research Facility (ISA), Tampa, FL ($68 million)<br />
••<br />
District School Board <strong>of</strong> Pasco County, Charles S. Rushe Middle<br />
School, Land O’ Lakes, FL ($36 million)<br />
••<br />
New Port Tampa Bay Site Work, Tampa, FL ($44.7 million)<br />
••<br />
Barnett Tower, <strong>St</strong>. <strong>Petersburg</strong>, FL ($75 million)<br />
Florida Polytechnic<br />
Lakeland, FL<br />
$80 million, 160,000-SF, Phase I <strong>of</strong> Florida<br />
Polytechnic, consists <strong>of</strong> 160,000-GSF Innovation<br />
Science and Technology Building including<br />
research labs, teaching labs, classrooms, <strong>of</strong>fice<br />
space, study space, support space, student<br />
spaces and common areas.<br />
Tampa Museum <strong>of</strong> Art<br />
Tampa, FL<br />
$28.6 million, 80,000-SF, The museum is an<br />
electronic “jewel box”, floating on a glass<br />
pedestal, a container to house works inspired<br />
with vision. By day, moray patterns stammer<br />
and blur the layers perforated facades. By night,<br />
the skin is illuminated in endless variations. The<br />
spaces accommodated in the museum facility<br />
include art gallery space, storage/work areas,<br />
educational spaces, conference and lecture<br />
rooms and <strong>of</strong>fices.<br />
958-26 CMAR with GMP for the Municipal Pier Replacement Project<br />
A. Experience and Qualifications<br />
Page 26