Basis of Design Book 2 - City of St. Petersburg
Basis of Design Book 2 - City of St. Petersburg
Basis of Design Book 2 - City of St. Petersburg
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
idge, highway & rail engineering<br />
entertainment engineering<br />
subaqueous investigation<br />
civil & site engineering<br />
structural design<br />
marine facilities<br />
geotechnics<br />
surveying<br />
forensics<br />
Minutes <strong>of</strong> Meeting<br />
Project Name:<br />
<strong>St</strong>. <strong>Petersburg</strong> Pier<br />
Project No.: 111367<br />
Meeting Date: June 27, 2012<br />
Meeting Location: <strong>St</strong>. <strong>Petersburg</strong> Pier – 800 2 nd Ave. Northeast, <strong>St</strong>. <strong>Petersburg</strong>, FL 33701<br />
Meeting No.: 2<br />
Meeting Purpose:<br />
To discuss the project and to ascertain general site conditions.<br />
<strong>St</strong>art Time:<br />
11:00 AM<br />
Report Date: June 28, 2012<br />
Signed:<br />
Andrew Habel, P.E.<br />
Attending: (copies to all)<br />
Name Organization Tel No E-Mail<br />
Neil Porto Buro Happold 212-334-2025 neil.porto@burohappold.com<br />
Peter Peterson* Applied Technology & Management 321-403-2163 ppeterson@appliedtm.com<br />
Michael Herrman* M<strong>of</strong>fatt & Nichol 813-258-8818 mherrman@m<strong>of</strong>fattnichol.com<br />
Raul Quintana* <strong>City</strong> <strong>of</strong> <strong>St</strong>. <strong>Petersburg</strong><br />
Richard Herrmann II* <strong>City</strong> <strong>of</strong> <strong>St</strong>. <strong>Petersburg</strong> 727-893-7852 rick.herrmann@st.pete.org<br />
Fred Dargahi* <strong>City</strong> <strong>of</strong> <strong>St</strong>. <strong>Petersburg</strong> 727-893-7852 fred.dargahi@st.pete.org<br />
Andrew Habel McLaren Engineering Group 845-353-6400 ahabel@mgmclaren.com<br />
* Not copied<br />
Copy Also:<br />
Malcolm McLaren McLaren Engineering Group 845-353-6400 mmclaren@mgmclaren.com<br />
<strong>St</strong>ephen Frech McLaren Engineering Group 845-353-6400 sfrech@mgmclaren.com<br />
Todd Manson McLaren Engineering Group 845-353-6400 tmanson@mgmclaren.com<br />
Item<br />
Description<br />
Items From Meeting No. 2<br />
Action<br />
2.1 The pier was built circa 1920. A concrete bulkhead exists at the shoreline at the northern<br />
edge <strong>of</strong> the pier and under the pier at bent 21. The bulkhead is tied into the concrete piles<br />
at bent 21, but does not support vertical load. The bulkhead was added some time after<br />
the initial construction <strong>of</strong> the pier in an effort to protect the piles landward <strong>of</strong> bent 21 and<br />
to prevent erosion. The inverted pyramid building at the end <strong>of</strong> the pier was added in<br />
1973 and houses several restaurants, retail stores, and an aquarium.<br />
2.2 Some doubt was present among the group as to whether the bent 21 piles would be able<br />
to be cut <strong>of</strong>f above the bulkhead and a new cap poured on top <strong>of</strong> the piles and wall. A<br />
new sheetpile wall with a concrete cap was suggested to replace the bulkhead at bent 21.<br />
Offices: New York, Maryland, Florida, Connecticut, California<br />
Licensed in:<br />
Arizona • Alabama • Arkansas • California • Colorado • Connecticut • Delaware • District <strong>of</strong> Columbia • Florida • Georgia • Hawaii<br />
Idaho • Illinois • Indiana • Kansas • Kentucky • Louisiana • Maryland • Massachusetts • Michigan • Minnesota • Mississippi• Missouri<br />
Nebraska • Nevada • New Hampshire • New Jersey• New York • North Carolina • Ohio • Oklahoma • Oregon • Pennsylvania<br />
Rhode Island• South Carolina• Tennessee•Texas•Trinidad & Tobago• Utah • Vermont • Virginia • Washington •West Virginia • Wisconsin<br />
M. G. McLAREN, P.C. .<br />
100 Snake Hill Road<br />
West Nyack, New York 10994<br />
Phone (845) 353-6400<br />
Fax (845) 353-6509<br />
e-mail: mgmclaren@mgmclaren.com<br />
On the web: www.mgmclaren.com