29.08.2014 Views

Basis of Design Book 2 - City of St. Petersburg

Basis of Design Book 2 - City of St. Petersburg

Basis of Design Book 2 - City of St. Petersburg

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Index Description Quantity Unit Cost Amount<br />

08 - Openings<br />

081000.00 - Doors & Frames<br />

96 Interior Door 4.00 ea 308.18 1,233<br />

97 Exterior Door - Type 1 - ea - -<br />

98 081000.00 - Doors & Frames 2,920.00 LF 0.42 1,233<br />

081213.00 - Hollow Metal Frames<br />

99 Ext Hollow Metal Door Frames 10.00 ea 145.00 1,450<br />

100 Int Hollow Metal Door Frames 4.00 ea 125.00 500<br />

101 081213.00 - Hollow Metal Frames 2,920.00 LF 0.67 1,950<br />

081313.00 - Hollow Metal Doors<br />

102 Ext Hollow Metal Door 10.00 ea 295.00 2,950<br />

103 081313.00 - Hollow Metal Doors 2,920.00 LF 1.01 2,950<br />

084100.00 - Entrances & <strong>St</strong>orefronts<br />

104 <strong>St</strong>orefronts (40% <strong>of</strong> wall area) 1,061.28 sf 75.00 79,596<br />

105 084100.00 - Entrances & <strong>St</strong>orefronts 2,920.00 LF 27.26 79,596<br />

087100.00 - Door Hardware<br />

106 Hardware Sets 22.00 ea 41.95 923<br />

107 087100.00 - Door Hardware 2,920.00 LF 0.32 923<br />

108 08 - Openings 2,920.00 LF 29.68 86,652<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!