Basis of Design Book 2 - City of St. Petersburg
Basis of Design Book 2 - City of St. Petersburg
Basis of Design Book 2 - City of St. Petersburg
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Walter Benoit<br />
Project Controls<br />
Personal <strong>St</strong>ats<br />
24 years in the industry<br />
Texas Tech University<br />
B.S., Civil Engineering<br />
AACE International<br />
(Association for the<br />
Advancement <strong>of</strong> Cost<br />
Engineers)<br />
ASCE (American Society <strong>of</strong><br />
Civil Engineers)<br />
Role and Expertise<br />
Walter is responsible for the design, implementation and management<br />
<strong>of</strong> all project control procedures, processes and tools, reporting<br />
requirements and project documentation. His specific functions<br />
include QA/QC, document control, scheduling, submittal management,<br />
contract administration, project communications and reporting and cost<br />
management.<br />
“<br />
There can be numerous complexities<br />
and challenges in a project such as<br />
this, however, this project gives us an<br />
opportunity to showcase our skills working<br />
on an occupied campus with a guaranteed<br />
end result <strong>of</strong> success for the <strong>City</strong>.<br />
”<br />
Gillette<br />
Additional Projects<br />
••<br />
Duke University, Chilled Water Plant, Durham, NC ($16 million)<br />
••<br />
<strong>St</strong>ate <strong>of</strong> Louisiana, University Medical Center, New Orleans, LA<br />
($690 million)<br />
••<br />
Delta Air Lines, Terminal A Redevelopment, Logan International<br />
Airport, Boston, MA ($384 million)<br />
Highlighted Projects<br />
The Raleigh Convention Center<br />
Raleigh, NC<br />
$169 million, 507,000-SF, 32-month<br />
construction management at risk convention<br />
center. This project includes 150,000-SF <strong>of</strong><br />
exhibit hall, 32,000-SF <strong>of</strong> main ballroom and<br />
30,000-SF <strong>of</strong> meeting rooms. The project<br />
included the erection <strong>of</strong> 8,081 tons <strong>of</strong> steel. The<br />
project is LEED Silver Certified.<br />
<strong>St</strong>adium<br />
Foxboro, MA<br />
Equipped with state-<strong>of</strong>-the-art facilities for<br />
maximum spectator enjoyment, the stadium<br />
includes 60,000 chair-back seats, 80 luxury<br />
suites containing another 2,000 seats and 6,000<br />
club seats. Other features include two club<br />
lounges, over 45 concession stands, 44 restroom<br />
areas, two concourses, an NFL retail store, an<br />
audio system that broadcasts throughout the<br />
entire stadium, and two 1,200-SF video boards.<br />
958-26 CMAR with GMP for the Municipal Pier Replacement Project<br />
A. Experience and Qualifications<br />
Page 31