29.08.2014 Views

Basis of Design Book 2 - City of St. Petersburg

Basis of Design Book 2 - City of St. Petersburg

Basis of Design Book 2 - City of St. Petersburg

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Walter Benoit<br />

Project Controls<br />

Personal <strong>St</strong>ats<br />

24 years in the industry<br />

Texas Tech University<br />

B.S., Civil Engineering<br />

AACE International<br />

(Association for the<br />

Advancement <strong>of</strong> Cost<br />

Engineers)<br />

ASCE (American Society <strong>of</strong><br />

Civil Engineers)<br />

Role and Expertise<br />

Walter is responsible for the design, implementation and management<br />

<strong>of</strong> all project control procedures, processes and tools, reporting<br />

requirements and project documentation. His specific functions<br />

include QA/QC, document control, scheduling, submittal management,<br />

contract administration, project communications and reporting and cost<br />

management.<br />

“<br />

There can be numerous complexities<br />

and challenges in a project such as<br />

this, however, this project gives us an<br />

opportunity to showcase our skills working<br />

on an occupied campus with a guaranteed<br />

end result <strong>of</strong> success for the <strong>City</strong>.<br />

”<br />

Gillette<br />

Additional Projects<br />

••<br />

Duke University, Chilled Water Plant, Durham, NC ($16 million)<br />

••<br />

<strong>St</strong>ate <strong>of</strong> Louisiana, University Medical Center, New Orleans, LA<br />

($690 million)<br />

••<br />

Delta Air Lines, Terminal A Redevelopment, Logan International<br />

Airport, Boston, MA ($384 million)<br />

Highlighted Projects<br />

The Raleigh Convention Center<br />

Raleigh, NC<br />

$169 million, 507,000-SF, 32-month<br />

construction management at risk convention<br />

center. This project includes 150,000-SF <strong>of</strong><br />

exhibit hall, 32,000-SF <strong>of</strong> main ballroom and<br />

30,000-SF <strong>of</strong> meeting rooms. The project<br />

included the erection <strong>of</strong> 8,081 tons <strong>of</strong> steel. The<br />

project is LEED Silver Certified.<br />

<strong>St</strong>adium<br />

Foxboro, MA<br />

Equipped with state-<strong>of</strong>-the-art facilities for<br />

maximum spectator enjoyment, the stadium<br />

includes 60,000 chair-back seats, 80 luxury<br />

suites containing another 2,000 seats and 6,000<br />

club seats. Other features include two club<br />

lounges, over 45 concession stands, 44 restroom<br />

areas, two concourses, an NFL retail store, an<br />

audio system that broadcasts throughout the<br />

entire stadium, and two 1,200-SF video boards.<br />

958-26 CMAR with GMP for the Municipal Pier Replacement Project<br />

A. Experience and Qualifications<br />

Page 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!