- Page 1:
THE NEW ST. PETERSBURG PIER BASIS O
- Page 5 and 6:
CONTENT: BASIS OF DESIGN BOOK 1 1 2
- Page 7:
AST. PETERSBURG PIER SITE CONDITION
- Page 10 and 11:
2. Parking Lots Parking lots exhibi
- Page 12 and 13:
4. Entrance Plaza The Entrance Plaz
- Page 14 and 15:
Electrical: There is a series of ab
- Page 16 and 17:
B. Bulkhead The bulkhead or seawall
- Page 18 and 19:
C. Existing Pier The existing Pier
- Page 20 and 21:
5. Navigational Access The current
- Page 22 and 23:
Meeting with City Engineers 6/28 A
- Page 55 and 56: Meeting Minutes (Rev 01) project Th
- Page 57: CCONCEPTUAL FIRE SAFETY STRATEGY PR
- Page 60 and 61: 6.0 RB initially expressed concern
- Page 63 and 64: idge, highway & rail engineering en
- Page 65: St. Petersburg Pier Page 3 MEG File
- Page 69 and 70: 1509 W. Swann Avenue, Suite 225 Tam
- Page 71 and 72: ERP Permit Application: New St. Pet
- Page 73 and 74: ERP Permit Application: New St. Pet
- Page 75 and 76: ERP Permit Application: New St. Pet
- Page 77 and 78: ERP Permit Application: New St. Pet
- Page 79 and 80: PART 3: A. Owner(s) of Land B. Appl
- Page 81 and 82: PART 8: A. If there have been any p
- Page 83 and 84: ENVIRONMENTAL RESOURCE PERMIT APPLI
- Page 85 and 86: 5. Summarize impacts to wetlands an
- Page 87 and 88: E. Drainage Information 1. Provide
- Page 89 and 90: TABLE ONE: PROJECT WETLAND AND OTHE
- Page 91 and 92: TABLE THREE: PROJECT OFF-SITE MITIG
- Page 93: TABLE FIVE: SUMMARY OF SHORELINE ST
- Page 99: ERP Permit Application: New St. Pet
- Page 102 and 103: Soil Map—Pinellas County, Florida
- Page 104 and 105: Soil Map-Pinellas County, Florida S
- Page 106: NEW ST. PETERSBURG PIER ST. PETERSB
- Page 121 and 122: 25 18 ALBERT WHITTED AIRPORT
- Page 146 and 147:
ERP Permit Application: New St. Pet
- Page 148 and 149:
St. Petersburg Pier - Environmental
- Page 150 and 151:
St. Petersburg Pier - Environmental
- Page 152 and 153:
ST. PETERSBURG PIER EVALUATION Pine
- Page 154 and 155:
ERP Permit Application: New St. Pet
- Page 156 and 157:
ALBERT WHITTED AIRPORT TECHNICAL ME
- Page 158 and 159:
ALBERT WHITTED AIRPORT TECHNICAL ME
- Page 160 and 161:
ALBERT WHITTED AIRPORT TECHNICAL ME
- Page 162 and 163:
ALBERT WHITTED AIRPORT TECHNICAL ME
- Page 166:
ERP Permit Application: New St. Pet
- Page 211:
FUNDERWATER FEATURE OUTREACH PROJEC
- Page 214 and 215:
MEETING TOPICS Meaning and Purpose
- Page 216 and 217:
Business Community Generate revenue
- Page 218 and 219:
Technical Interview 1 Summary of In
- Page 220 and 221:
Lastly, we discussed schedule of up
- Page 222 and 223:
feature to provide a platform for e
- Page 224 and 225:
and mentioned that he had heard of
- Page 227 and 228:
HYDRODYNAMICS AND FLUSHING OF THE P
- Page 229 and 230:
LIST OF TABLES 6-1 Flushing Simulat
- Page 231 and 232:
LIST OF FIGURES 6-2b Time Series Pl
- Page 233 and 234:
2.0 PROJECT DESCRIPTION AND HYDRODY
- Page 235 and 236:
Figure 2-3a. Marina Basin Plan View
- Page 237 and 238:
The proposed marina consists of a f
- Page 239 and 240:
Various studies have been published
- Page 241 and 242:
implicit, and simultaneously comput
- Page 243 and 244:
4.2 MODEL GRID(S) AND BATHYMETRY Fi
- Page 245 and 246:
Figures 4-3 and 4-4 present the bat
- Page 247 and 248:
4.3 BOUNDARY CONDITIONS Boundary co
- Page 249 and 250:
Figure 4-7. Model Wind Forcing GNV/
- Page 251 and 252:
Figure 5-2. Simulated versus Measur
- Page 253 and 254:
The results show current magnitudes
- Page 255 and 256:
Figure 6-1a. Plan View Showing Init
- Page 257 and 258:
Figure 6-1e. Plan View Showing Flus
- Page 259 and 260:
Figure 6-2c. Time Series Plot of Pe
- Page 261:
7.0 REFERENCES Meyers, S.D., E. M.
- Page 309:
IVISION/GUIDING PRINCIPLES AND CONT
- Page 312 and 313:
Table of Contents SECTION I SECTION
- Page 314 and 315:
Section I Vision
- Page 316 and 317:
DOWNTOWN WATERFRONT GOAL AND GUIDIN
- Page 318 and 319:
Guiding Principles (continued): Wa
- Page 320 and 321:
CITY CHARTER Per the City Charter,
- Page 322 and 323:
Section III 1988 Waterfront Park Ma
- Page 324 and 325:
Study Purpose January 23, 1986
- Page 326 and 327:
Plan Recommendations (14) 1. Major
- Page 328 and 329:
Section IV Implementation of 1988 W
- Page 330 and 331:
Plan Implementation in the Waterfro
- Page 332 and 333:
Article IV Section 5-81. Purpose an
- Page 334 and 335:
DOWNTOWN WATERFRONT ENTERPRISE FACI
- Page 336 and 337:
Progress Energy Center for the Arts
- Page 338 and 339:
Municipal Pier ● ● In April 200
- Page 340 and 341:
WATERFRONT TRANSPORTATION PLAN ELEM
- Page 342 and 343:
Waterfront Pedestrian Connections (
- Page 344 and 345:
Downtown Trail System ● ● ●
- Page 346 and 347:
Waterfront Scenic Drive ● ● The
- Page 348 and 349:
Section VII Downtown Waterfront Mas
- Page 351:
J SKANSKA - KEY PERSONNEL
- Page 354 and 355:
Roger Stephan, LEED® AP Executive
- Page 356 and 357:
William Flemming CEO - Executive Su
- Page 358 and 359:
John Clark Senior Project Manager -
- Page 360 and 361:
Richard Lee Superintendent/Quality
- Page 362 and 363:
Patrick McGlynn Superintendent/Qual
- Page 364 and 365:
Christina Huber, LEED® AP BIM Mana
- Page 366 and 367:
Brian Coakley Preconstruction Suppo
- Page 368 and 369:
Steve Arsht Preconstruction Support
- Page 370 and 371:
David Espy Environmental, Health an
- Page 373 and 374:
HIGHLIGHTS OF ASCE 24-05 Flood Resi
- Page 375 and 376:
• Tanks that are below the design
- Page 377:
I TABLE 1-1. Classification of Stru
- Page 382 and 383:
1509 West Swann Avenue, Suite 225 T
- Page 384 and 385:
Memorandum March 1, 2010 Page 3 of
- Page 386 and 387:
Memorandum March 1, 2010 Page 5 of
- Page 389:
MCOST MODEL (SKANSKA)
- Page 392 and 393:
Index Description Quantity Unit Cos
- Page 394 and 395:
Index Description Quantity Unit Cos
- Page 396 and 397:
Index Description Quantity Unit Cos
- Page 398 and 399:
Index Description Quantity Unit Cos
- Page 400 and 401:
Index Description Quantity Unit Cos
- Page 402 and 403:
Index Description Quantity Unit Cos
- Page 404 and 405:
Index Description Quantity Unit Cos
- Page 406 and 407:
Index Description Quantity Unit Cos
- Page 408 and 409:
Index Description Quantity Unit Cos
- Page 410 and 411:
Index Description Quantity Unit Cos
- Page 412 and 413:
Index Description Quantity Unit Cos
- Page 415:
NLIFE CYCLE COST ANALYSIS REPORT
- Page 419:
The New St Petersburg Pier Clarific
- Page 423:
The New St. Petersburg Pier Annual
- Page 427:
The New St. Petersburg Pier Replace
- Page 431 and 432:
INTERNATIONAL DESIGN COMPETITION ST
- Page 433 and 434:
Pier Competition | Page 2 Stage 2
- Page 435 and 436:
Pier Competition | Page 4 Design Pa
- Page 437 and 438:
Pier Competition | Page 6 The Honor
- Page 439 and 440:
Pier Competition | Page 8 VII. Stag
- Page 441 and 442:
Pier Competition | Page 10 3. Forma
- Page 443 and 444:
Pier Competition | Page 12 6. Publi
- Page 445 and 446:
Pier Competition | Page 14 Exhibit
- Page 447 and 448:
Pier Competition | Page 16 Pier Tas
- Page 449 and 450:
Pier Competition | Page 18 Exhibit
- Page 451 and 452:
Pier Competition | Page 20 Irrespec
- Page 453 and 454:
Pier Competition | Page 22 Exhibit
- Page 455 and 456:
Pier Competition | Page 24
- Page 458:
THE NEW ST. PETERSBURG PIER CLIENT