The New <strong>St</strong>. <strong>Petersburg</strong> Pier<br />

Replacement Schedule<br />

2012 2015 2015 Price Total Replacement Cost<br />

U/P U/P Each Replacement 10 20 30 40 50 Over 50 Years<br />

Resurface and Restripe Asphalt Drives 57,129 sf $ 3.00 $ 3.16 $ 180,809<br />

$ 258,331<br />

$ 369,090 $ 263,668 $<br />

891,089<br />

Replace Floating Docks 6,255 sf $ 150 $ 158.25 $ 989,833<br />

$ 1,690,422<br />

$ 1,905,340 $<br />

3,595,763<br />

Note: All prices are escalated by 1.8% per year<br />

50 year cycle starts in 2015 when Pier will be Operational