Basis of Design Book 2 - City of St. Petersburg
Basis of Design Book 2 - City of St. Petersburg
Basis of Design Book 2 - City of St. Petersburg
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Brian Coakley<br />
Preconstruction Support<br />
Personal <strong>St</strong>ats<br />
23 years in the industry<br />
New Jersey Institute <strong>of</strong><br />
Technology<br />
B.S., Construction/<br />
Contracting Engineering<br />
Technology<br />
Highlighted Projects<br />
Union County College<br />
A.S., Civil/Construction<br />
Engineering Technology<br />
Role and Expertise<br />
Brian directs and manages the preconstruction team and process. He<br />
works closely with the A/E and owner to ensure that all necessary<br />
resources are supplied for the preconstruction effort, beginning with<br />
the programming documents and schematic design phase. Brain<br />
is responsible for the cost estimating, GMP development, value<br />
engineering, and works closely with the construction team to develop<br />
the bid packages and determine best value recommendations. He<br />
also has a staff <strong>of</strong> architectural, structural, civil, mechanical and<br />
electrical estimators available to support the reconstruction effort as<br />
required. Brian will work with key members <strong>of</strong> the project team during<br />
preconstruction for constructability, site utilization and scheduling<br />
reviews.<br />
“<br />
My long history working on projects <strong>of</strong> this scope<br />
puts me in the perfect position to assist the team in<br />
ensuring success. I’ve worked on dozens <strong>of</strong> high-pr<strong>of</strong>ile<br />
projects and am looking forward to sharing my insights<br />
with the <strong>City</strong> and the design team.<br />
”<br />
Additional Projects<br />
••<br />
Morton Plant Patient Tower, Clearwater, FL ($141 million)<br />
Florida Polytechnic<br />
Lakeland, FL<br />
$80 million, 160,000-SF, Phase I <strong>of</strong> Florida<br />
Polytechnic, consists <strong>of</strong> 160,000-GSF Innovation<br />
Science and Technology Building including<br />
research labs, teaching labs, classrooms, <strong>of</strong>fice<br />
space, study space, support space, student<br />
spaces and common areas.<br />
Canaveral Port Cruise Terminal 6<br />
Cape Canaveral, FL<br />
$25.6 million,110,000-SF, design-build, twostory<br />
cruise terminal and surrounding site to<br />
further expand cruise operations.<br />
••<br />
Morton Plant Mease, Central Utility Plant, Safety Harbor, FL ($35 million)<br />
••<br />
Shands HealthCare, Medical Office Building, Gainesville, FL ($26 million)<br />
••<br />
Duke University Genetics Institute Project, Durham, NC ($30 million)<br />
958-26 CMAR with GMP for the Municipal Pier Replacement Project<br />
A. Experience and Qualifications<br />
Page 32