29.08.2014 Views

Basis of Design Book 2 - City of St. Petersburg

Basis of Design Book 2 - City of St. Petersburg

Basis of Design Book 2 - City of St. Petersburg

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OT Delancy<br />

Executive Support - SBE/MWBE Liaison<br />

Personal <strong>St</strong>ats<br />

17 years in the industry<br />

Florida A&M University<br />

B.S., Construction<br />

Engineering Technology<br />

Highlighted Projects<br />

Juris Doctorate<br />

Licensed General<br />

Contractor, <strong>St</strong>ate <strong>of</strong> Florida<br />

<strong>St</strong>. <strong>Petersburg</strong> Resident<br />

Role and Expertise<br />

OT he is charged with the leading the diversity and inclusion effort for<br />

Skanska, and he work closely with our project teams. His primary role on<br />

projects is to coordinate community outreach events to encourage SBE/<br />

MWBE and small business participation. Working with the project team,<br />

his involvement will ensure that we meet – and exceed - diversity goals.<br />

F-A-M-I-L-Y. <strong>St</strong>.<strong>Petersburg</strong> represents family to me. Each <strong>of</strong><br />

the my children - who are now ages ten, eight, and four yearsold -<br />

were born at Bayfront Medical Center in downtown <strong>St</strong>. <strong>Petersburg</strong>.<br />

My wife grew up in the South <strong>St</strong> <strong>Petersburg</strong> area, and now my<br />

family makes <strong>St</strong>. <strong>Petersburg</strong> our home. My wife and I constantly<br />

stress the message <strong>of</strong> building the community by participating in<br />

every aspect <strong>of</strong> its growth and stability. In our spare time, my wife<br />

and I volunteer in local youth programs and mentor kids in the<br />

South <strong>St</strong>. <strong>Petersburg</strong> area. As a construction pr<strong>of</strong>essional, any time<br />

I see facility improvements and maintenance projects taking place<br />

in the city, whether its simple lawn maintenance, or large vertical<br />

construction, I try to take the opportunity to give my kids a life lesson<br />

on the importance <strong>of</strong> community improvements. An opportunity<br />

to work on the Pier project and the Pier’s symbolic value as a<br />

monumental component <strong>of</strong> the <strong>St</strong>. <strong>Petersburg</strong> community, would<br />

be such a pr<strong>of</strong>ound occasion for me personally, as I have a heart-felt<br />

attachment to this community. This project will certainly represent a<br />

landmark moment in our family history.<br />

“<br />

”<br />

Additional Projects<br />

••<br />

Florida Polytechnic, Lakeland, FL ($80 million)<br />

••<br />

Curtis Hixon Waterfront Park, Kiley Gardens Repair and Tampa Riverwalk ($21.6<br />

million)<br />

••<br />

<strong>City</strong> <strong>of</strong> Miami Gardens, Municipal Complex, Miami Gardens, FL ($35 million)<br />

••<br />

Ritz Carlton Golf Lodge, Naples, FL ($41 million)<br />

••<br />

Pasco-Hernando Community College, Porter Campus ($30 million)<br />

<strong>St</strong>. <strong>Petersburg</strong> Christian School<br />

Classroom Building<br />

<strong>St</strong>. <strong>Petersburg</strong>, FL<br />

This building will be 30,000-SF total, and<br />

include 22 classrooms, administrative space<br />

and cafeteria. The three-story building will<br />

serve students in grades K-5. In addition, the<br />

project scope includes a new playground area,<br />

landscaping, new parking area and associated<br />

sitework.<br />

Tampa Museum <strong>of</strong> Art<br />

Tampa, FL<br />

$28.6 million, 80,000-SF, The museum is an<br />

electronic “jewel box”, floating on a glass<br />

pedestal, a container to house works inspired<br />

with vision. By day, moray patterns stammer<br />

and blur the layers perforated facades. By night,<br />

the skin is illuminated in endless variations. The<br />

spaces accommodated in the museum facility<br />

include art gallery space, storage/work areas,<br />

educational spaces, conference and lecture<br />

rooms and <strong>of</strong>fices.<br />

958-26 CMAR with GMP for the Municipal Pier Replacement Project<br />

A. Experience and Qualifications<br />

Page 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!