<strong>St</strong>. <strong>Petersburg</strong> Pier Page 3<br />

MEG File No. 111367 Meeting held June 27, 2012<br />

that the city did not to want to lose the ability to moore somewhat larger vessels to the pier<br />

from time to time. As an example, the HMS Bounty has been moored to the existing pier<br />

in the past. Regarding the marina, marine traffic is purported to be transient; i.e. marinabased<br />

day-traffic and maybe a tourist-taxi vessel. No overnight mooring is to be allowed.<br />

Some fendering will be required to protect the pier from vessel impact.<br />

2.10 An 8.5”x11” hard copy <strong>of</strong> the attached plan titled “Pier <strong>St</strong>ructural Elements Plan View” was<br />

provided at the meeting by Rick Herrmann.<br />

The preceding minutes have been developed for the referenced meeting. Please advise the author <strong>of</strong> any corrections or<br />

omissions within five days. If no such notification is received, the minutes will be understood to be complete and<br />

accurate. If notification is received within five days, it will be reviewed and revised minutes will be transmitted to<br />

original recipients <strong>of</strong> the minutes.<br />

p:\mgm-ny<strong>of</strong>fice\proj111\111367 - st. petersburg pier\5. project mgmt (sched,mtg minutes,agendas,qc)\meeting minutes\minutes02 -<br />

2012-06-27.doc<br />

M. G. McLAREN, P.C.