29.08.2014 Views

Basis of Design Book 2 - City of St. Petersburg

Basis of Design Book 2 - City of St. Petersburg

Basis of Design Book 2 - City of St. Petersburg

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Index Description Quantity Unit Cost Amount<br />

1 01 - General Requirements 2,920.00 LF 107.88 315,000<br />

2 02 - Existing Conditions 2,920.00 LF 90.09 263,052<br />

3 03 - Concrete 2,920.00 LF 2,241.59 6,545,439<br />

4 04 - Masonry 2,920.00 LF 26.58 77,599<br />

5 05 - Metals 2,920.00 LF 2,184.24 6,377,977<br />

6 06 - Wood, Plastics, And Composites 2,920.00 LF 42.60 124,378<br />

7 07 - Thermal And Moisture Protection 2,920.00 LF 1,734.18 5,063,791<br />

8 08 - Openings 2,920.00 LF 29.68 86,652<br />

9 09 - Finishes 2,920.00 LF 12.41 36,224<br />

10 10 - Specialties 2,920.00 LF 18.94 55,309<br />

11 12 - Furnishings 2,920.00 LF 58.27 170,152<br />

12 13 - Special Construction 2,920.00 LF 478.01 1,395,775<br />

13 14 - Conveying Equipment 2,920.00 LF 45.74 133,571<br />

14 21 - Fire Suppression 2,920.00 LF 1.94 5,672<br />

15 22 - Plumbing 2,920.00 LF 48.44 141,449<br />

16 23 - Heating, Ventilating, And Air-Conditioning (Hvac) 2,920.00 LF 6.22 18,151<br />

17 26 - Electrical 2,920.00 LF 807.32 2,357,373<br />

18 27 - Communications 2,920.00 LF 92.19 269,207<br />

19 28 - Electronic Safety And Security 2,920.00 LF 27.05 79,000<br />

20 31 - Earthwork 2,920.00 LF 1,586.94 4,633,855<br />

21 32 - Exterior Improvements 2,920.00 LF 657.25 1,919,181<br />

22 33 - Utilities 2,920.00 LF 257.43 751,695<br />

23 TOTAL DIRECT CONSTRUCTION COST 2,920.00 LF 10,554.97 30,820,502<br />

1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!