Index Description Quantity Unit Cost Amount<br />

31 - Earthwork<br />

312323.00 - Fill<br />

207 Fill By Borrow 12,478.00 cy 21.95 273,914<br />

208 312323.00 - Fill 2,920.00 LF 93.81 273,914<br />

314100.00 - Shoring<br />

209 Sheet Piling at Seawall 5,455.00 sf 22.71 123,871<br />

210 314100.00 - Shoring 2,920.00 LF 42.42 123,871<br />

316213.19 - Precast Concrete Piles<br />

211 Concrete Precast Vertical Piles 18" 16,662.00 lf 70.72 1,178,400<br />

212 Concrete Precast Battered Piles 18" 19,940.00 lf 74.90 1,493,420<br />

213 316213.19 - Precast Concrete Piles 2,920.00 LF 915.01 2,671,820<br />

316329.00 - Drilled Concrete Piers & Shafts<br />

214 Caissons - 24" dia Concrete Filled <strong>St</strong>eel Casing at Ramp 400.00 lf 485.00 194,000<br />

215 Caissons - 48" dia Concrete Filled <strong>St</strong>eel Casing 1,827.00 lf 750.00 1,370,250<br />

216 316329.00 - Drilled Concrete Piers & Shafts 2,920.00 LF 535.70 1,564,250<br />

217 31 - Earthwork 2,920.00 LF 1,586.94 4,633,855<br />