29.08.2014 Views

Basis of Design Book 2 - City of St. Petersburg

Basis of Design Book 2 - City of St. Petersburg

Basis of Design Book 2 - City of St. Petersburg

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Index Description Quantity Unit Cost Amount<br />

09 - Finishes<br />

092116.00 - Gypsum Board Assemblies<br />

109 Partition Type 1- Building Core 2,540.00 sf 5.50 13,970<br />

110 Partition Type 2 - CMU 600.00 sf 10.50 6,300<br />

111 092116.00 - Gypsum Board Assemblies 2,920.00 LF 6.94 20,270<br />

095000.00 - Ceilings<br />

112 Ceilings - Building Core 1,183.00 sf 4.50 5,324<br />

113 095000.00 - Ceilings 2,920.00 LF 1.82 5,324<br />

099113.00 - Exterior Painting<br />

114 Paint - Doors, Latex Paint - 2 Finish Coats 18.00 ea 75.00 1,350<br />

115 Paint - HM Frame 18.00 ea 65.00 1,170<br />

116 Exterior Painting 6,207.92 sf 1.25 7,760<br />

117 099113.00 - Exterior Painting 2,920.00 LF 3.52 10,280<br />

099123.00 - Interior Painting<br />

118 Paint - Doors, Latex Paint - 2 Finish Coats 4.00 ea 75.00 300<br />

119 Paint - HM Frame 4.00 ea 12.71 51<br />

120 099123.00 - Interior Painting 2,920.00 LF 0.12 351<br />

121 09 - Finishes 2,920.00 LF 12.41 36,224<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!