29.08.2014 Views

Basis of Design Book 2 - City of St. Petersburg

Basis of Design Book 2 - City of St. Petersburg

Basis of Design Book 2 - City of St. Petersburg

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Bicycle Pedestrian Pathway<br />

●<br />

●<br />

●<br />

●<br />

Since the 1988 Waterfront Parks Master Plan was developed and many <strong>of</strong> its objectives<br />

reinforced during the Vision 20/20 Plan development, alternative transportation<br />

has become an ever increasingly important element to the system.<br />

A pedestrian/bicycle Pathway System is now almost complete and not only connects<br />

downtown waterfront parks but connects the waterfront with the rest <strong>of</strong> <strong>St</strong>. <strong>Petersburg</strong><br />

and Pinellas County.<br />

The downtown trail connects to:<br />

Waterfront parks<br />

Waterfront facilities<br />

Pinellas Trail<br />

North Bay Trail<br />

Extensive bicycle rack installation has been implemented with over 150 new bike<br />

racks added to the Downtown Area.<br />

December 2011<br />

DRAFT<br />

Page 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!