06.10.2014 Views

Handbook for Bridge Inspections - TSP2

Handbook for Bridge Inspections - TSP2

Handbook for Bridge Inspections - TSP2

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8 Reporting<br />

the Results of<br />

<strong>Inspections</strong><br />

8.1 Acceptance <strong>Inspections</strong> -<br />

Warranty <strong>Inspections</strong><br />

Acceptance <strong>Inspections</strong> and Warranty <strong>Inspections</strong> should preferably<br />

be printed on <strong>Bridge</strong> Management Systems inspection <strong>for</strong>ms,<br />

since these have been designed to suit each individual bridge<br />

depending on the data in the BMS module <strong>for</strong> the structure.<br />

Irthe data <strong>for</strong> some bridges have not been recorded in the BMS,<br />

indi vidual reports require to be drawn lip, the contents of which<br />

can have the fo llowing stmcture:<br />

1. Summary containing an overview of any damage, faults or<br />

defects to be repaired.<br />

2. Description of the bridge and the system afloealing damage.<br />

3. Results of visual inspections.<br />

4. Results of the measurements and material testing.<br />

5. Assessment of the recorded damage, faults or defects. Indicate<br />

which of these require repair and whether some of them may be<br />

possible sources of future destructi ve developments.<br />

8.2 Routine <strong>Inspections</strong><br />

The reports <strong>for</strong> all Routine <strong>Inspections</strong> should be printed on the BMS<br />

inspections fonns which have been designed to suit each individual<br />

bridge and type of in spection.<br />

The inspection fonns should be taken to inspections and then completed<br />

on site. The fo llowing routines can be of assistance.<br />

General <strong>Inspections</strong> require points I to 6 and 12 to be carried out.<br />

I. The Inspector should check whether there are missing or incom<br />

plete data with reference to bridge category, its position, type of<br />

stmcture or the equipment required to gain access.<br />

2. The name (initials) of the Inspector together with the date of the<br />

inspection should be completed on the <strong>for</strong>m.<br />

3. The Inspector can record any general comments about the<br />

inspection.<br />

4. Experiences, events, specific damage or the such like can be<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 117

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!