9.1 ELEMENTS IN THE GROUND<br />

Original Level<br />

~-..I....- \--1" .f-:7--.~<br />

/ :""<br />

. r . 9~· ~ ~<br />

\le'/el after Erosion<br />

Example 9. 1-6<br />

The original undenvater ground level has been eroded<br />

down to the same level as the bottom of the<br />

base foundation slab due to insufficient protection<br />

against erosion.<br />

Type of Damage: 103<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

3C<br />

Cause of Damage: 13<br />

Poor design solutions<br />

Procedures: Replenish with suitabl e materials and<br />

install protection against erosion within one year.<br />

•<br />

,<br />

Original level<br />

\ " •<br />

•<br />

"<br />

•<br />

• "<br />

"<br />

•<br />

Level after Erosion<br />

~<br />

Example 9. 1-7<br />

The original underwater ground level has altered<br />

due to erosion with severe consequences <strong>for</strong> the<br />

carrying capacity. The ba ll ast co nsists of too fine a<br />

grade of material.<br />

Type of Damage:<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

Cause of Damage:<br />

Construction fa ult<br />

103<br />

4C<br />

38<br />

Procedures: Replen ish wit h suitab le materials and<br />

install protection against erosion in the course of<br />

s ix months.<br />

Example 9.1-8<br />

The base foundation slab has suffered under-scouring<br />

as the result of a serious flood. Carrying capaci<br />

ty has been greatly reduced.<br />

Type of Damage: 103<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

4C<br />

Cause of Damage: 73<br />

Flooding<br />

Procedures: The bridge should be closed until<br />

repairs have been carried out" immediate infilling<br />

with concrete under the foundations, replenish ing<br />

w ith suitable materials a nd installing protection<br />

against erosion to the same level as the origi nal<br />

river bed.