9.1 ELEMENTS IN THE GROUND<br />
Original Level<br />
~-..I....- \--1" .f-:7--.~<br />
/ :""<br />
. r . 9~· ~ ~<br />
\le'/el after Erosion<br />
Example 9. 1-6<br />
The original undenvater ground level has been eroded<br />
down to the same level as the bottom of the<br />
base foundation slab due to insufficient protection<br />
against erosion.<br />
Type of Damage: 103<br />
Scouring/erosion of river course<br />
Degree of Damage &<br />
Consequences:<br />
3C<br />
Cause of Damage: 13<br />
Poor design solutions<br />
Procedures: Replenish with suitabl e materials and<br />
install protection against erosion within one year.<br />
•<br />
,<br />
Original level<br />
\ " •<br />
•<br />
"<br />
•<br />
• "<br />
"<br />
•<br />
Level after Erosion<br />
~<br />
Example 9. 1-7<br />
The original underwater ground level has altered<br />
due to erosion with severe consequences <strong>for</strong> the<br />
carrying capacity. The ba ll ast co nsists of too fine a<br />
grade of material.<br />
Type of Damage:<br />
Scouring/erosion of river course<br />
Degree of Damage &<br />
Consequences:<br />
Cause of Damage:<br />
Construction fa ult<br />
103<br />
4C<br />
38<br />
Procedures: Replen ish wit h suitab le materials and<br />
install protection against erosion in the course of<br />
s ix months.<br />
Example 9.1-8<br />
The base foundation slab has suffered under-scouring<br />
as the result of a serious flood. Carrying capaci<br />
ty has been greatly reduced.<br />
Type of Damage: 103<br />
Scouring/erosion of river course<br />
Degree of Damage &<br />
Consequences:<br />
4C<br />
Cause of Damage: 73<br />
Flooding<br />
Procedures: The bridge should be closed until<br />
repairs have been carried out" immediate infilling<br />
with concrete under the foundations, replenish ing<br />
w ith suitable materials a nd installing protection<br />
against erosion to the same level as the origi nal<br />
river bed.