9.1 ELEMENTS IN THE GROUND<br />

Example 9.1-9<br />

Under-scouring of foundations on vertical piles<br />

because of insufficient protection agai nst erosion.<br />

Vertical, but not horizontal loads can be accommodated,<br />

whilst the piles can be subjected to un<strong>for</strong>eseen<br />

sources of impact. The consequences <strong>for</strong> the bridge's<br />

carrying capacity arc serious.<br />

Type of Damage: 103<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

4C<br />

Cause of Damage: 12<br />

Erroneus calculat ions<br />

Procedures: Infi lling with concrete under the foundati<br />

ons, replenishing with su itable matcrials and<br />

installing protection against erosion. This shou ld be<br />

carried out within 6 months.<br />

Example 9.1-10<br />

Erosion of the embankment caused by the water<br />

from the pavement not being drained off as planned.<br />

If the situation is allowed to continue at the present<br />

rate of development, maintenance costs will be<br />

affected. Since a lot of public transport passes under<br />

the bridge, the damage is also of consequence fo r its<br />

appearance.<br />

Type of Damage:<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

Cause of Damage:<br />

Construction fau lt<br />

103<br />

3M,3E<br />

38<br />

Procedures: Infill ing with suitable materials,<br />

improvements to the drainage system and installati ­<br />

on of protecti on against erosion. To be carried oul<br />

during the year in question.<br />

Example 9.1-11<br />

A combination of erosion of the in fi ll behind the<br />

wing-walls and inadequate anchoring of the elements<br />

has resulted in the displacement of the fac ing<br />

slabs at the top edge of the bridge. Consequently<br />

there is a risk of them falling onto the pathway<br />

below the bri dge.<br />

Type of Damage: 103<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

4T<br />

Cause of Damage: 38<br />

Faulty Construction<br />

Procedures: The elements should be righted and<br />

made safe within 6 months.