9.1 ELEMENTS IN THE GROUND<br />
Example 9.1-9<br />
Under-scouring of foundations on vertical piles<br />
because of insufficient protection agai nst erosion.<br />
Vertical, but not horizontal loads can be accommodated,<br />
whilst the piles can be subjected to un<strong>for</strong>eseen<br />
sources of impact. The consequences <strong>for</strong> the bridge's<br />
carrying capacity arc serious.<br />
Type of Damage: 103<br />
Scouring/erosion of river course<br />
Degree of Damage &<br />
Consequences:<br />
4C<br />
Cause of Damage: 12<br />
Erroneus calculat ions<br />
Procedures: Infi lling with concrete under the foundati<br />
ons, replenishing with su itable matcrials and<br />
installing protection against erosion. This shou ld be<br />
carried out within 6 months.<br />
Example 9.1-10<br />
Erosion of the embankment caused by the water<br />
from the pavement not being drained off as planned.<br />
If the situation is allowed to continue at the present<br />
rate of development, maintenance costs will be<br />
affected. Since a lot of public transport passes under<br />
the bridge, the damage is also of consequence fo r its<br />
appearance.<br />
Type of Damage:<br />
Scouring/erosion of river course<br />
Degree of Damage &<br />
Consequences:<br />
Cause of Damage:<br />
Construction fau lt<br />
103<br />
3M,3E<br />
38<br />
Procedures: Infill ing with suitable materials,<br />
improvements to the drainage system and installati <br />
on of protecti on against erosion. To be carried oul<br />
during the year in question.<br />
Example 9.1-11<br />
A combination of erosion of the in fi ll behind the<br />
wing-walls and inadequate anchoring of the elements<br />
has resulted in the displacement of the fac ing<br />
slabs at the top edge of the bridge. Consequently<br />
there is a risk of them falling onto the pathway<br />
below the bri dge.<br />
Type of Damage: 103<br />
Scouring/erosion of river course<br />
Degree of Damage &<br />
Consequences:<br />
4T<br />
Cause of Damage: 38<br />
Faulty Construction<br />
Procedures: The elements should be righted and<br />
made safe within 6 months.