Carbonation Depth<br />
OL-________ L-~~------------~<br />
o<br />
Depth<br />
'Figure 7.3-4:Chloride Pl'Oji/c.embeddefJ chlol'ide ill C(ll'bollisetl COl/crete<br />
Defrosting salt<br />
Chloride resulting from defrosting salt or sand mixed w ith salt is<br />
able to penetrate the bridge deck fro m the topside if tl1-e bridge has<br />
not been equipped with a damp course. The fo llowing ca n be considered<br />
as vulnerable areas:<br />
* Edge girders and the underside of bridge decks along a bridge's<br />
edges<br />
* Joint constructions<br />
* Pillars supporting approach sections to a bridge<br />
* Abutment piers and cul vert walls situated 0 - 2 m. from a bridge<br />
* Localised areas under water outl ets and otherwise in depressi<br />
ons where waler is stagnant .<br />
Marine Climates<br />
Vu lnerable sections of coastal concrete bridges are described in<br />
Chapter 7.3.9.<br />
Procedures<br />
Reference is made to the Norwegian Public Roads Administration<br />
<strong>Handbook</strong> No. 0 14: " Laboratory Testing" and No. 015: "On Site<br />
Testing".<br />
The diffe rences in depth of the measurements and the intervals<br />
between test sites in a profile must be estimated in light of the<br />
positioning of the rein<strong>for</strong>cement and the objective oft he test. In<br />
some cases the intelVals detai led in Procedura l Codc-2 can appear<br />
to be a little rough. The alternative depth intervals <strong>for</strong> 30 mm. and<br />
50 mm. respectively <strong>for</strong> a pl anned cover could <strong>for</strong> example be:<br />
30 mm planned cover:<br />
50 mm planned cover:<br />
2-10 mm ., 10-20 mm. , 20-30 mm., 30-45 mm., 45-70 mm.<br />
2-15 mm., IS-3D mm., 30-50 mm., 50-75 mm. , 75- 100 mm.