Handbook for Bridge Inspections - TSP2
Handbook for Bridge Inspections - TSP2
Handbook for Bridge Inspections - TSP2
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
9.1 ELEMENTS IN THE GROUND<br />
Example9.1-1<br />
Subsidence or the infill behind the abutment pi er<br />
has caused a difference in height of27 mm in the<br />
road surface. The bridge is situated on a main road<br />
and subject to a lot ofhcavy traffi c. The gap has<br />
resulted in noise pollution <strong>for</strong> those li ving in the<br />
vicinity of the bridge. The damage has affected<br />
both traffic safety and the environment.<br />
Type of Damage:<br />
Degree of Damage &<br />
Consequences:<br />
Cause of Damage:<br />
101 Subsidence<br />
3T,3M<br />
61 Traffic Loads<br />
Procedures:<br />
Fill with asphalt within I year.<br />
Example 9.1-2<br />
Severe subsidence of the bark infi ll with a resultant<br />
large difference in height between the bridge and<br />
the inti I\, The damage is to be considered as dangerous<br />
<strong>for</strong> traffic, and the subsidence has also affected<br />
Ihe appearance of the wall underneath the bridge.<br />
The di splacement of the columns indicates that the<br />
pressure exerted by the earth has cause additional,<br />
great strai n on them.<br />
Type of Damage:<br />
Degree of Damage &<br />
Consequences:<br />
Cause of Damage:<br />
of Materials<br />
101 Subsidence<br />
3T,2M<br />
II Incorrect Choi ce<br />
Procedures: Replacement of the material with, <strong>for</strong><br />
example, EPS. The condition of the columns must<br />
be carefully checked after removal of the old material.<br />
Example 9.1-3<br />
Subsidence o f the earth under a small part of a<br />
wing-wall. This can affect load bearing capacity<br />
should the subsidence develop.<br />
Type of Damage:<br />
Degree of Damage &<br />
Consequences:<br />
Cause of Damage:<br />
101 Subsidence<br />
2C<br />
9 Other/Unknown<br />
Procedures:<br />
5 years.<br />
Fill with appropri ate material within