06.10.2014 Views

Handbook for Bridge Inspections - TSP2

Handbook for Bridge Inspections - TSP2

Handbook for Bridge Inspections - TSP2

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

9.1 ELEMENTS IN THE GROUND<br />

Example9.1-1<br />

Subsidence or the infill behind the abutment pi er<br />

has caused a difference in height of27 mm in the<br />

road surface. The bridge is situated on a main road<br />

and subject to a lot ofhcavy traffi c. The gap has<br />

resulted in noise pollution <strong>for</strong> those li ving in the<br />

vicinity of the bridge. The damage has affected<br />

both traffic safety and the environment.<br />

Type of Damage:<br />

Degree of Damage &<br />

Consequences:<br />

Cause of Damage:<br />

101 Subsidence<br />

3T,3M<br />

61 Traffic Loads<br />

Procedures:<br />

Fill with asphalt within I year.<br />

Example 9.1-2<br />

Severe subsidence of the bark infi ll with a resultant<br />

large difference in height between the bridge and<br />

the inti I\, The damage is to be considered as dangerous<br />

<strong>for</strong> traffic, and the subsidence has also affected<br />

Ihe appearance of the wall underneath the bridge.<br />

The di splacement of the columns indicates that the<br />

pressure exerted by the earth has cause additional,<br />

great strai n on them.<br />

Type of Damage:<br />

Degree of Damage &<br />

Consequences:<br />

Cause of Damage:<br />

of Materials<br />

101 Subsidence<br />

3T,2M<br />

II Incorrect Choi ce<br />

Procedures: Replacement of the material with, <strong>for</strong><br />

example, EPS. The condition of the columns must<br />

be carefully checked after removal of the old material.<br />

Example 9.1-3<br />

Subsidence o f the earth under a small part of a<br />

wing-wall. This can affect load bearing capacity<br />

should the subsidence develop.<br />

Type of Damage:<br />

Degree of Damage &<br />

Consequences:<br />

Cause of Damage:<br />

101 Subsidence<br />

2C<br />

9 Other/Unknown<br />

Procedures:<br />

5 years.<br />

Fill with appropri ate material within

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!