ecorded under their own points should they be considered<br />

important <strong>for</strong> others in the future.<br />

5, Only those elements wh ich wi ll be checked during the actual<br />

inspection are to be mentioned on the inspection fonn. Elements<br />

located above the water level wi ll not be included in inspection<br />

fonns used <strong>for</strong> Ma in <strong>Inspections</strong> Under Water. Should the<br />

bridge incorporate elements other than those ind icated, these<br />

can subsequently be added to the fonn. Any fau lts or defects<br />

should be commented on so that they can be rect ifi ed by the<br />

next inspection. One should check that the elements have been<br />

recorded as us ing the correct material, have been allocated the<br />

correct type description and, ifneed be, axes.<br />

6. All elements included in an inspecti on shall be checked <strong>for</strong> pos<br />

sible damage which should then be described <strong>for</strong> each element<br />

with the use of damage designations. In each instance the degree<br />

and the consequences of the damage is to be assessed. I freIe<br />

vant, the damage can be illustrated by taking a photograph.<br />

7. Ifpossible, provide the cause(s) of the damage.<br />

8. Proposed maintenance measures and when these will be carried<br />

out must be described <strong>for</strong> all damage of level m 2. Procedure<br />

Nos. 87 and 88 in Norwegian Public Roads Admini stration<br />

Manual No. 026: ' Procedural Code - 2. 1997' \ .... ill be of assitance<br />

in describing these measures.<br />

9. Esti mates should be drawn up <strong>for</strong> each proposed pi ece of main<br />

tenance based on the extent of the damage and the unit cost. The<br />

extent of the damage, i.e. size and quantity, should be noted on<br />

the fonn during the in spection.<br />

10 The results of any measurements and materials testing should<br />

be presented as indicated in Chapter 8.4 'Measurements' and<br />

Chapter 8.5 'Materials Testing'.<br />

II. A Special In spection (see Chapter 6.7) is to be recommended if<br />

Routine <strong>Inspections</strong> uncover a great need <strong>for</strong> repairs or are not<br />

sufficient fo r determining the kind of damage, its consquences,<br />

extent or cause(s). A note should be made of the measure<br />

menls/materials testing to be undertaken, the degree to which<br />

this should be done and the localion(s).<br />

12. The results of the inspection should be recorded in BRUTUS<br />

International at the conclusion of the inspection.<br />

13. Ifrequired the inspection and maintenance plans may be adjusted.<br />

118<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>