These effects are presented in order of importance. Damage that<br />

affects carrying capacity, will there<strong>for</strong>e be given higher priority<br />

than that affecti ng environment or maintenance costs.<br />

When relevant, the cost of repairs shall also include traffic costs as<br />

wei l.<br />

One damage may have several consequences.<br />

Assessment of Damage by<br />

Combining Degree and<br />

Consequence of Damage<br />

Damage that affects the<br />

Carrying Capacity<br />

The condition of a bridge element is assessed by cOllS idering the<br />

seriousness and effect of any damage to it. The assessment therefo<br />

re, is a combination of the degree and consequence of the damage.<br />

This combination results in the final assessment ofthc damage as<br />

outlined below:<br />

I C = Minor damage/defect that in the long run may present<br />

danger to the carrying capacity of the structure. The<br />

damage might not require repair within the coming 10<br />

years.<br />

2C = Average damage/defect which can reduce the carrying<br />

capacity of the structure ifno repair is carried out within<br />

the next 3-10 years. The damage must be repaired within<br />

3- 10 years.<br />

3C = Serious damage/defect which can rcduce the carrying<br />

capacity of the structure ifno repair is carried out within<br />

the next 1-3 years. The damage must bc repaired within<br />

\-3 years.<br />

4C = Critical damage which has reduced or is about to reduce<br />

the carrying capacity of the structure. The damage must<br />

be repaired immediately or within half a year if safety<br />

precautions shall be avoided. Report on the findings<br />

shall be submitted to the <strong>Bridge</strong> Engineer immedia<br />

tely.<br />

Damage influencing the<br />

Traffic Safety<br />

Damage inftuencing the<br />

Maintenance Cost<br />

lT ~<br />

2T ~<br />

3T ~<br />

4T ~<br />

lM ~<br />

Minor damage/defect that might in the long run present<br />

danger to the traffic safety. The damage m ight not requi<br />

re to be repaired within the coming 10 years.<br />

Average damage/defect which can reduce the traffic<br />

safety if no repair is carried out within the nex t 3-1 0<br />

years. The damage must be repaired withill 3- 10 years.<br />

Serious damage/defect whi ch can reduce t he traffic safe<br />

ty lfno repair is carried out within the nex t 1-3 years.<br />

The damage must be repai red within 1-3 years.<br />

Critical damage which has reduced or is about to reduce<br />

traffic safety. The damage must be repaired immediately<br />

or wi thin half a year if safety precautions s hall be avo<br />

ided.<br />

Report on the findings shall be submitted to the<br />

<strong>Bridge</strong> Engineer immediately.<br />

Minor damage/defect that in the long run, is considered<br />

to influence the maintenance costs. The damage mi gh t<br />

not require to be repaired with in the coming 10 years.