Cause of Damage<br />
I<br />
Faulty Design<br />
11 lncorrect choice of materials<br />
12 Erroneous calculations<br />
13 Poor design solutions<br />
14 Deviation from standards<br />
15 Inadequate regulations<br />
19 Other fau hy design<br />
2 Material DamagelDefect<br />
21 Poor material composition<br />
22 Inadequate strength<br />
23 Delamination<br />
24 Chloride introduced during mixing<br />
process<br />
25 Alkaline reactive aggregates<br />
29 Other material defects<br />
3 Faulty Construction<br />
31 Settlement of scaffolding<br />
32 Incorrectly placed rein<strong>for</strong>cement<br />
33 Faulty concreting<br />
34 Insufficient finishing<br />
35 Inadequate curing procedures<br />
36 Premature loading<br />
37 Installation fault<br />
39 Other faulty construction<br />
4 Insufficient Maintenance<br />
41 Excessive vegetation<br />
42 Insufficient removal of ice<br />
43 Untimely application of protective<br />
measure<br />
44 Inadequate maintenance<br />
• Wrong materials selected.<br />
• improper or wrong calculations.<br />
• Poor design with regards to maintenance<br />
• i.e. those in <strong>for</strong>ce when the bridge was<br />
constructed.<br />
• e.g. coastal bridges which have been<br />
constructed according to the regulations laid<br />
down <strong>for</strong> inland bridges<br />
• Wrong or improper compositions of materials<br />
or incorrect concrete mix<br />
• Can be like: Poor quality of materials in<br />
taking compression, less tension capacity than<br />
expected, less shear capacity etc ..<br />
• Separation of material into layers.<br />
• Chlorides from aggregates or additives during<br />
the mixing of concrete.<br />
• Aggregate containing alkal ine minerals<br />
• Vertical movement of scaffolding.<br />
• Rein<strong>for</strong>cement not located within the<br />
limitations of tolerance.<br />
• Wrong vibration, to dense rein<strong>for</strong>cement, etc.<br />
• The surface is not in accordance with<br />
requirements.<br />
• Lack of or poor curing lead ing to cracks,<br />
improper quality etc ..<br />
• Loading be<strong>for</strong>e concrete has achieved<br />
required strength.<br />
• Improper installation of a component<br />
• Vegetation growth in river course that can<br />
obstruct the waterway<br />
• Lack of or improper removal of ice<br />
• Incorrcct protection of material<br />
• Maintenance work not carried out in