Cause of Damage<br />

I<br />

Faulty Design<br />

11 lncorrect choice of materials<br />

12 Erroneous calculations<br />

13 Poor design solutions<br />

14 Deviation from standards<br />

15 Inadequate regulations<br />

19 Other fau hy design<br />

2 Material DamagelDefect<br />

21 Poor material composition<br />

22 Inadequate strength<br />

23 Delamination<br />

24 Chloride introduced during mixing<br />

process<br />

25 Alkaline reactive aggregates<br />

29 Other material defects<br />

3 Faulty Construction<br />

31 Settlement of scaffolding<br />

32 Incorrectly placed rein<strong>for</strong>cement<br />

33 Faulty concreting<br />

34 Insufficient finishing<br />

35 Inadequate curing procedures<br />

36 Premature loading<br />

37 Installation fault<br />

39 Other faulty construction<br />

4 Insufficient Maintenance<br />

41 Excessive vegetation<br />

42 Insufficient removal of ice<br />

43 Untimely application of protective<br />

measure<br />

44 Inadequate maintenance<br />

• Wrong materials selected.<br />

• improper or wrong calculations.<br />

• Poor design with regards to maintenance<br />

• i.e. those in <strong>for</strong>ce when the bridge was<br />

constructed.<br />

• e.g. coastal bridges which have been<br />

constructed according to the regulations laid<br />

down <strong>for</strong> inland bridges<br />

• Wrong or improper compositions of materials<br />

or incorrect concrete mix<br />

• Can be like: Poor quality of materials in<br />

taking compression, less tension capacity than<br />

expected, less shear capacity etc ..<br />

• Separation of material into layers.<br />

• Chlorides from aggregates or additives during<br />

the mixing of concrete.<br />

• Aggregate containing alkal ine minerals<br />

• Vertical movement of scaffolding.<br />

• Rein<strong>for</strong>cement not located within the<br />

limitations of tolerance.<br />

• Wrong vibration, to dense rein<strong>for</strong>cement, etc.<br />

• The surface is not in accordance with<br />

requirements.<br />

• Lack of or poor curing lead ing to cracks,<br />

improper quality etc ..<br />

• Loading be<strong>for</strong>e concrete has achieved<br />

required strength.<br />

• Improper installation of a component<br />

• Vegetation growth in river course that can<br />

obstruct the waterway<br />

• Lack of or improper removal of ice<br />

• Incorrcct protection of material<br />

• Maintenance work not carried out in