13.11.2014 Views

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />

D2.1 Description of user needs<br />

and requirements, and<br />

evaluation of existing tools<br />

D1.4 1 st update of <strong>PRE</strong>-<strong>DRIVE</strong>-<br />

<strong>C2X</strong>/COMeSafety<br />

architecture framework<br />

D3.2 Detailed selection procedure<br />

description of testing tools<br />

and Management centres<br />

and relative specifications of<br />

the selected ones.<br />

D6.2 Mid Term Join Workshop<br />

including all relevant<br />

stakeholders on pan-<br />

European architecture<br />

D2.2 Description of overall<br />

simulation system<br />

architecture<br />

D3.3 Complete Prototype System,<br />

including Hardware and<br />

Software components.<br />

D3.4 Detailed <strong>report</strong> on the core<br />

components’ integration,<br />

functional verification and<br />

duplication results<br />

D4.3 Requirements and selection<br />

of test and trial sites (A),<br />

specification and integration<br />

of test management centre<br />

(B) and implementation of<br />

test management tools (C)<br />

D2.3 Description of<br />

communication, traffic and<br />

environmental models and<br />

their integration and<br />

validation<br />

2000 HIT 3 R PP M11<br />

1000 BMW 2 R PU M12<br />

3000 FHG 3 R PP M12<br />

6000 CRF 2 O PU M12<br />

2000 DLR 3 R PP M21<br />

3000 DEL 55 P PP M23<br />

3000 DAG 2 R PP M23<br />

4000 FHG 2 R PP M23<br />

2000 PTV 2 R PP M23<br />

<strong>D0.3</strong> <strong>Final</strong> Report 0000 DAG 3 R PU M24<br />

D1.5 2nd update of <strong>PRE</strong>-<strong>DRIVE</strong>-<br />

<strong>C2X</strong>/COMeSafety<br />

architecture framework<br />

D5.1 Demonstration and test of<br />

prototype system<br />

D5.2 –<br />

merge<br />

d with<br />

former<br />

D5.3<br />

Social impact of cooperative<br />

systems; Political economics<br />

and business economic<br />

impacts of the system,<br />

potential business models<br />

D6.3 <strong>Final</strong> Workshop including all<br />

relevant stakeholders on<br />

pan-European architecture<br />

1000 BMW 2 R PU M24<br />

5000 DAG 55 D PU M24<br />

5000 FACIT/<br />

DAG<br />

4 R PU M24<br />

6000 CRF 2 O PU M24<br />

<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 90<br />

<strong>Final</strong> Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!