13.11.2014 Views

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />

The logic tree was the foundation for the Excel models that were set up for the<br />

financial calculation to be done to verify the business models. Input data was<br />

collected during interviews with experts from inside and outside the project. Based<br />

on the outcome of these expert interviews and other data such a sales forecast<br />

quantitative and qualitative assumptions were made for issues such as market<br />

penetration or costs for equipment or services and verified during various iterations<br />

with the specific experts. The output of the Friendly User Tests was also projected<br />

into the business case.<br />

After defining all relevant assumptions and other input data, the financial model was<br />

completed in order to give a first indication on the financial metrics described above.<br />

Apart from this, all qualitative advantages and disadvantages were described<br />

together with suggestions for the next steps.<br />

Outcome of the work in WP5300 was a powerful tool for assessing cooperative<br />

systems from the business economics point of view, which was then applied on the<br />

basis of the data collected in the various interviews. The work is documented in<br />

<strong>Deliverable</strong> D5.2/5.3 “Social impact of cooperative systems/ Political economics and<br />

business economic impacts of the system, potential business models”.<br />

2.2.6 WP6000 Dissemination<br />

The objectives of WP6000 Dissemination were to open the framework of<br />

cooperation to all relevant stakeholders working on cooperative systems and to key<br />

partners in the different European countries in order to pave the road for the<br />

forthcoming field operational trials and to prepare the future deployment phase and<br />

market introduction. Additionally this work package was working on opening the<br />

publishable results to the whole ITS audience and to the public and on acting hand<br />

in hand with relevant standardisation bodies such as ETSI TC ITS.<br />

The structure of the work package reflects this objectives:<br />

<br />

WP6100 Workshops with relevant stakeholders<br />

WP6200 Dissemination of project activities and results to the whole ICT<br />

community<br />

<br />

<br />

WP6300 Contribution to relevant standardisation activities<br />

WP6400 Planning of actions towards users’ awareness and steps to market<br />

introduction.<br />

In the following the work done in WP6000 is described in some more detail:<br />

2.2.6.1 Project corporate identity, web site, printed material<br />

At the beginning of the project, the <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> project identity was defined,<br />

via the design of a project logo and related templates and via the preparation of a<br />

<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 20<br />

<strong>Final</strong> Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!