PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 9/29/2010<br />
1 Management summary<br />
Based on the overall description of a common European architecture for an<br />
inter-vehicle and vehicle-to-infrastructure communication system defined by<br />
COMeSafety, <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> has developed a detailed system specification<br />
and a functionally verified prototype. This is robust enough to be used for<br />
future field operational trials of cooperative systems. Furthermore, <strong>PRE</strong>-<br />
<strong>DRIVE</strong> <strong>C2X</strong> developed an integrated simulation model for cooperative<br />
systems, which, for the first time, enables a holistic approach for estimation of<br />
the expected benefits in terms of safety, efficiency and environment. This work<br />
was accompanied by the development of tools and methods necessary for<br />
functional verification and testing of cooperative systems in laboratory<br />
environment, on test tracks and on real roads in the framework of field<br />
operational trials. In the project these were applied to the <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong><br />
prototype system in order to verify its proper functioning and to perform a first<br />
impact assessment. Last but not least extensive dissemination activities were<br />
conducted in order to communicate the benefits of cooperative systems<br />
technology to the public and to address all relevant European stakeholder.<br />
This included participation to the relevant European standardisation activities<br />
such as ETSI TC ITS or the respective working groups of the Car 2 Car-<br />
Communication Consortium C2C-CC.<br />
This <strong>report</strong> gives an overview on the work done and the results achieved in<br />
the two project years. It can be considered as a summary of the various<br />
deliverables prepared in the project life time.<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 1<br />
<strong>Final</strong> Report