<strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 9/29/2010<br />

2.1.5 WP5000 Demonstration and impact assessment<br />

In order to proof the proper functioning of the system architecture prototype<br />

and to validate the evaluation methodologies developed in <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> a<br />

first assessment was conducted. It helped to identify methodological gaps as<br />

well as technical deficits in time and avoided time consuming bug fixing. Also,<br />

this assessment, that was accompanied by an application of the simulation<br />

tool set developed in the project gives a first impression of the system benefits<br />

that can be expected - one particular outcome was a reliable cost/benefit<br />

estimation accompanied by the description of viable business models - and<br />

delivers valuable data for the design of the test sites if it is decided, that the<br />

prototype system shall be further evaluated in a field operational trial. The<br />

assessment was combined with a system demonstration for interested parties<br />

in order to promote the common European communication architecture and<br />

the planned field trial.<br />

2.1.6 WP6000 Dissemination<br />

The key scope of the dissemination activities was to open the framework of<br />

cooperation to all relevant stakeholders and key partners in the different<br />

European counties to facilitate future market introduction with a high<br />

penetration rate as well as to facilitate future planning of extensive field<br />

operational tests on cooperative systems.<br />

This major aim was achieved via the organization of joint workshops, via the<br />

dissemination of project activities to the whole ICT community, and by<br />

identification of steps to market introduction.<br />

A multi-level web site was created to address specific and detailed materials<br />

to different interested community (the large public and journalists, the ICT<br />

community, all relevant stakeholders that are and will work on the design<br />

development and testing of cooperative systems).<br />

Support material for dissemination like project brochure and newsletters were<br />

also produced and the project participated to all relevant ITS, TRA, IEEE etc.<br />

major congresses and to organized a final workshop to widely disseminate<br />

project results.<br />

Dissemination activities were also targeted to provide specific inputs to the<br />

related standardisation bodies and to continuously exchange relevant<br />

information with all running projects and with other communities in the world.<br />

This was achieved through active contribution to the ongoing ETSI TC ITS<br />

activities by <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> members and participation to the Joint EU(US<br />

Task Force for harmonisation of cooperative systems.<br />

Figure 1 shows the overall structure of <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> down to task level.<br />

<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 5<br />