2.1.5 WP5000 Demonstration and impact assessment<br />
In order to proof the proper functioning of the system architecture prototype<br />
and to validate the evaluation methodologies developed in <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> a<br />
first assessment was conducted. It helped to identify methodological gaps as<br />
well as technical deficits in time and avoided time consuming bug fixing. Also,<br />
this assessment, that was accompanied by an application of the simulation<br />
tool set developed in the project gives a first impression of the system benefits<br />
that can be expected - one particular outcome was a reliable cost/benefit<br />
estimation accompanied by the description of viable business models - and<br />
delivers valuable data for the design of the test sites if it is decided, that the<br />
prototype system shall be further evaluated in a field operational trial. The<br />
assessment was combined with a system demonstration for interested parties<br />
in order to promote the common European communication architecture and<br />
the planned field trial.<br />
2.1.6 WP6000 Dissemination<br />
The key scope of the dissemination activities was to open the framework of<br />
cooperation to all relevant stakeholders and key partners in the different<br />
European counties to facilitate future market introduction with a high<br />
penetration rate as well as to facilitate future planning of extensive field<br />
operational tests on cooperative systems.<br />
This major aim was achieved via the organization of joint workshops, via the<br />
dissemination of project activities to the whole ICT community, and by<br />
identification of steps to market introduction.<br />
A multi-level web site was created to address specific and detailed materials<br />
to different interested community (the large public and journalists, the ICT<br />
community, all relevant stakeholders that are and will work on the design<br />
development and testing of cooperative systems).<br />
Support material for dissemination like project brochure and newsletters were<br />
also produced and the project participated to all relevant ITS, TRA, IEEE etc.<br />
major congresses and to organized a final workshop to widely disseminate<br />
project results.<br />
Dissemination activities were also targeted to provide specific inputs to the<br />
related standardisation bodies and to continuously exchange relevant<br />
information with all running projects and with other communities in the world.<br />
This was achieved through active contribution to the ongoing ETSI TC ITS<br />
activities by <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> members and participation to the Joint EU(US<br />
Task Force for harmonisation of cooperative systems.<br />
Figure 1 shows the overall structure of <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> down to task level.<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 5<br />
<strong>Final</strong> Report