13.11.2014 Views

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />

time. The test operator has a complete overview on running tests, e.g. the vehicle<br />

positions and each ITS Vehicle Station’s internal status.<br />

Figure 44: TMC Scenario Editor<br />

The corresponding documentation is available in deliverable D4.3 “Requirements<br />

and selection of test and trial sites (A), specification and integration of test<br />

management centre (B) and implementation of test management tools (C)”.<br />

Test management center – TMC<br />

The test management centre provides an environment where all test related<br />

functionalities connect to. It provides components to manage a reliable data<br />

transmission for monitoring and logging data as well as control data. A database<br />

was designed and realized to store all test related data. Entries range from defined<br />

test cases to logged test run data. We distinguish three basic components deployed<br />

at the test management centre. These are<br />

<br />

<br />

<br />

the test data database,<br />

the test data exchange component and<br />

the live data exchange component.<br />

All components of the test management centre, including their internal and external<br />

data flows, are described in deliverable D4.3.<br />

<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 56<br />

<strong>Final</strong> Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!