PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />
time. The test operator has a complete overview on running tests, e.g. the vehicle<br />
positions and each ITS Vehicle Station’s internal status.<br />
Figure 44: TMC Scenario Editor<br />
The corresponding documentation is available in deliverable D4.3 “Requirements<br />
and selection of test and trial sites (A), specification and integration of test<br />
management centre (B) and implementation of test management tools (C)”.<br />
Test management center – TMC<br />
The test management centre provides an environment where all test related<br />
functionalities connect to. It provides components to manage a reliable data<br />
transmission for monitoring and logging data as well as control data. A database<br />
was designed and realized to store all test related data. Entries range from defined<br />
test cases to logged test run data. We distinguish three basic components deployed<br />
at the test management centre. These are<br />
<br />
<br />
<br />
the test data database,<br />
the test data exchange component and<br />
the live data exchange component.<br />
All components of the test management centre, including their internal and external<br />
data flows, are described in deliverable D4.3.<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 56<br />
<strong>Final</strong> Report