<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />
D6.6 Document entitled: “Towards<br />
Europe-wide implementation<br />
of cooperative systems<br />
technology” that will include<br />
also the definition and<br />
analysis of all relevant<br />
enabling and disabling<br />
factors for the market<br />
introduction of cooperative<br />
systems, a list of actions to<br />
create users’ awareness and<br />
relevant inputs to<br />
standardisation bodies.<br />
6000 CRF 3 R PU M24<br />
TOTAL 172<br />
3.2 Milestones<br />
Milestone<br />
no.<br />
Milestone name<br />
List and schedule of milestones<br />
WPs<br />
no's.<br />
Lead<br />
beneficiary<br />
Delivery<br />
date<br />
from<br />
Annex I<br />
5<br />
Comments<br />
MS1 Use cases for common European WP4000 DAG M3 <strong>Deliverable</strong> D4.1<br />
system selected<br />
MS2 System architecture description WP1000 BMW M6 <strong>Deliverable</strong> D1.1<br />
available<br />
MS3 Functionally verified prototype WP3000 DEL M23 <strong>Deliverable</strong> D3.3<br />
system available<br />
MS4 Simulation tools available WP2000, PTV M23 <strong>Deliverable</strong> D2.3<br />
MS5 Test tools available WP4000 FHG M23 <strong>Deliverable</strong> D4.3<br />
MS6<br />
Impact assessment completed,<br />
end of project<br />
WP5000 DAG M27 <strong>Deliverable</strong> D5.2 (incl.<br />
<strong>Deliverable</strong> D5.3)<br />
5<br />
Month in which the milestone will be achieved. Month 1 marking the start date of the project,<br />
and all delivery dates being relative to this start date.<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 91<br />
<strong>Final</strong> Report