<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />
2.2 Work performed during the entire project<br />
In the following the work performed by the <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> partners in the various<br />
work packages of the project is described.<br />
2.2.1 WP1000 System architecture<br />
In cooperation with the project partners and with European Support Action<br />
COMeSafety WP1000 “System Architecture” elaborated the architecture<br />
specification for a common European <strong>C2X</strong> communication system, which was the<br />
basis for all further work in <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong>.<br />
The work begun with the COMeSafety <strong>report</strong> and requirements data base<br />
implemented in MS Access to be sent to the <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> partners for review<br />
with respect to the <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> needs. A “wish list” was created and<br />
harmonised, which was the bases for all further work in WP1000. Together with the<br />
development of the backend services description, an issue that was never<br />
addressed in previous projects in the area of cooperative systems, <strong>Deliverable</strong> D1.1<br />
“Definition of <strong>PRE</strong>-<strong>DRIVE</strong>-<strong>C2X</strong>/COMeSafety architecture framework” has been<br />
prepared, reviewed and submitted.<br />
It became apparent soon that for development of a sound system architecture for<br />
cooperative systems collaboration with other <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> work packages was<br />
essential. Therefore a joint working group has been established by the work<br />
packages WP1200 “Architecture refinement and extension” and WP4200<br />
“Requirements and specifications for test and demonstration” that met regularly to<br />
work on the further refinement of the system architecture. First outcome of these<br />
activities was <strong>Deliverable</strong> D1.2 “<strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> / COMeSafety refined<br />
architecture”. Also discussions on deployment of IEEE 1471 guidelines for <strong>PRE</strong>-<br />
<strong>DRIVE</strong> <strong>C2X</strong> and on the use of ETSI documents in <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> took place.<br />
Another major topic of WP1000 was to define a security architecture building on the<br />
architecture descriptions given in the <strong>Deliverable</strong>s D1.1 and 1.2., which was<br />
addressed by work package WP1300 “Security architecture”. The outcome of this<br />
work is documented in <strong>Deliverable</strong> D1.3 “Security architecture of the <strong>PRE</strong>-<strong>DRIVE</strong><br />
<strong>C2X</strong> / COMeSafety architecture”.<br />
In the following period of time, the activities in WP1000 were focused on the<br />
architecture milestone. Therefore, the two important deliverables were finalized:<br />
<br />
<br />
<strong>Deliverable</strong> D1.2 “Refined Architecture”<br />
<strong>Deliverable</strong> D1.3: “Security architecture of the <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> / COMeSafety<br />
architecture”<br />
Since D1.2 and D1.3 were important documents for other projects, too, the <strong>PRE</strong>-<br />
<strong>DRIVE</strong> <strong>C2X</strong> Steering Committee decided to change the publication status from<br />
“project-internal” to “public”. This way, both deliverables were disseminated to the<br />
respective projects, namely the European Support Action COMeSafety and the<br />
COMeSafety Architecture Task Force, the Car2Car Communication Consortium<br />
C2C-CC, the German project sim TD and the ETSI Technical Committee ITS.<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 2<br />
<strong>Final</strong> Report