<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />
communications are managed. This included a description and management of<br />
identities for vehicular communications.<br />
In-vehicle security stresses the necessary components within the vehicle, such as<br />
intrusion detection systems or firewalls, to create a trustworthy sender and protect in<br />
vehicle systems.<br />
Privacy defines the components necessary for protecting the privacy of the users of<br />
the communication system.<br />
<strong>Final</strong>ly, the administrative processes look at vehicular communications to ensure<br />
vehicle homologation, insurance updates, and in field operation.<br />
The overall security architecture was suitable, extendable and future proof for the<br />
use in different use cases. It was the foundation for the later specification of the<br />
security system. Selected aspects of the security architecture can be tested and<br />
validated in later field trials, such as privacy provisioning, identity management and<br />
trustworthy movement data.<br />
<strong>Final</strong>ly, Figure 17 shows the test view definition, related to a more detailed<br />
architectural view of the reference protocol stack shown in Figure 15 and it<br />
describes the ITS Station from the perspective of a tester. The view’s objective was<br />
to illustrate requirements to validate the proper functioning concerning all<br />
dimensions (functional and non-functional requirements).<br />
The test-specific view was to be concerned when developing the system, integrating<br />
new applications, functionalities, new hard- or software components or in case the<br />
system in use is changed or updated. The view was limited to the ITS Station and<br />
did not include the complete testing system, which is described extensively in<br />
WP4000. Furthermore, it described the general view of testing and the limited<br />
approach of <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> based on the general objective of the project to<br />
validate applications and their impacts.<br />
Figure 17: ITS Test View<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 28<br />
<strong>Final</strong> Report