13.11.2014 Views

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />

ITS Testing unit<br />

The ITS testing unit was deployed as a software component at the ITS station.<br />

Within <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong>, focus was on a testing unit tailored to the ITS vehicle<br />

station. It was possible to deploy it at all running test vehicles (or ITS vehicle<br />

stations respectively) and to validate its proper functioning with help of the full<br />

system tests in Brunswick and Ulm. The complete functionality and implementation<br />

of the component is described in deliverable D4.3.<br />

Test driver communication unit - TCU<br />

The test driver receives guidance and driving instructions in order to let her/him<br />

know, what to do during the test drives.<br />

Figure 45: Messages displayed on TCU<br />

The test driver communication unit was implemented as an application deployed at<br />

a cell phone running an Android operating system. It handles all the interaction<br />

between the test operator and the test drivers. Figure 45 shows, how the messages<br />

are displayed to the test driver.<br />

Test site selection<br />

The work package has identified several potential test sites for a large scale field<br />

trial with cooperative systems on European level. These are located in<br />

<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 57<br />

<strong>Final</strong> Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!