PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />
Figure 4: Cooperative platform for ITS applications<br />
Plug tests showed the interoperability of different radio suppliers as well as the<br />
various implementations of networking layers. This result allowed starting the<br />
integration of the prototype inside the vehicles. Moreover, the plug tests showed that<br />
the design of the middleware platform was successfully performed. In fact, the<br />
components were plugged easily with minor issues. In parallel, the implementation<br />
of the test bench was finalized and properly plugged inside the reference<br />
middleware platform.<br />
Being <strong>Deliverable</strong> D3.3 “Complete Prototype System, including Hardware and<br />
Software components.” the developed hard- and software platform was integrated<br />
into eleven vehicles provided by the OEMs and into the two RSUs provided by the<br />
suppliers of the projects. <strong>Deliverable</strong> D3.4 “Detailed <strong>report</strong> on the core components’<br />
integration, functional verification and duplication results” describes the<br />
components´ integration, functional verification and duplication in detail.<br />
2.2.4 WP4000 Methodologies and tools for field operational test management and<br />
validation<br />
Work package 4000 addressed all questions regarding the test and validation of the<br />
system prototype, which was developed in work package WP3000. Its objective was<br />
to analyze all requirements reasoned not only by the small-scale field operational<br />
test conducted within <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> but also by large scale field operational and<br />
pan-European tests of cooperative driving technology as it has been defined in work<br />
package WP1000. WP4000 aimed at developing a methodology to test relevant<br />
prototypes with regard to technical and impact related questions. The work package<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 10<br />
<strong>Final</strong> Report