<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />

Figure 4: Cooperative platform for ITS applications<br />

Plug tests showed the interoperability of different radio suppliers as well as the<br />

various implementations of networking layers. This result allowed starting the<br />

integration of the prototype inside the vehicles. Moreover, the plug tests showed that<br />

the design of the middleware platform was successfully performed. In fact, the<br />

components were plugged easily with minor issues. In parallel, the implementation<br />

of the test bench was finalized and properly plugged inside the reference<br />

middleware platform.<br />

Being <strong>Deliverable</strong> D3.3 “Complete Prototype System, including Hardware and<br />

Software components.” the developed hard- and software platform was integrated<br />

into eleven vehicles provided by the OEMs and into the two RSUs provided by the<br />

suppliers of the projects. <strong>Deliverable</strong> D3.4 “Detailed <strong>report</strong> on the core components’<br />

integration, functional verification and duplication results” describes the<br />

components´ integration, functional verification and duplication in detail.<br />

2.2.4 WP4000 Methodologies and tools for field operational test management and<br />

validation<br />

Work package 4000 addressed all questions regarding the test and validation of the<br />

system prototype, which was developed in work package WP3000. Its objective was<br />

to analyze all requirements reasoned not only by the small-scale field operational<br />

test conducted within <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> but also by large scale field operational and<br />

pan-European tests of cooperative driving technology as it has been defined in work<br />

package WP1000. WP4000 aimed at developing a methodology to test relevant<br />

prototypes with regard to technical and impact related questions. The work package<br />

<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 10<br />

<strong>Final</strong> Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!