PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />
In order to deduce a suitable test system, representative test cases were edited.<br />
Based on these, the requirements for the test system were deduced within this work<br />
package. Each requirement was evaluated for instance if it is mandatory or not. An<br />
overview of these requirements is given in deliverable D4.2 “Requirements and<br />
specification of testing architecture and procedures and requirements and<br />
specification of test management centre”, which also includes the basic test system<br />
architecture and specification.<br />
With regard to the field operational test environment (see chapter 2.2.4), we<br />
identified, specified and realized the following sub-systems (see Fehler!<br />
Verweisquelle konnte nicht gefunden werden.):<br />
<br />
<br />
<br />
the test operator client,<br />
the test management centre,<br />
the ITS testing unit and<br />
the test driver communication unit. .<br />
Figure 43: Specified and implemented FOT test system architecture<br />
Test operator client<br />
The test operator client provides the user interface for the test operator. With help of<br />
this sub-system, the operator is able to define test cases or scenarios (scenario<br />
editor tool), to monitor the test (CODAR viewer) and to control the test in real-time<br />
(test control tool). All these tools were implemented, integrated and tested. They are<br />
available and ready to use.<br />
Figure 44 shows the Scenario Editor. This is a web-based tool to define scenarios,<br />
in which a number of routes to be driven are defined. It provides the possibility to<br />
define the complete test run, including the selection of involved vehicles, adjusted<br />
vehicles’ trajectories, location-based test triggers and the selection of log and<br />
monitoring data. The Test Control provides an instrument to control tests in real-<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 55<br />
<strong>Final</strong> Report