13.11.2014 Views

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />

In order to deduce a suitable test system, representative test cases were edited.<br />

Based on these, the requirements for the test system were deduced within this work<br />

package. Each requirement was evaluated for instance if it is mandatory or not. An<br />

overview of these requirements is given in deliverable D4.2 “Requirements and<br />

specification of testing architecture and procedures and requirements and<br />

specification of test management centre”, which also includes the basic test system<br />

architecture and specification.<br />

With regard to the field operational test environment (see chapter 2.2.4), we<br />

identified, specified and realized the following sub-systems (see Fehler!<br />

Verweisquelle konnte nicht gefunden werden.):<br />

<br />

<br />

<br />

the test operator client,<br />

the test management centre,<br />

the ITS testing unit and<br />

the test driver communication unit. .<br />

Figure 43: Specified and implemented FOT test system architecture<br />

Test operator client<br />

The test operator client provides the user interface for the test operator. With help of<br />

this sub-system, the operator is able to define test cases or scenarios (scenario<br />

editor tool), to monitor the test (CODAR viewer) and to control the test in real-time<br />

(test control tool). All these tools were implemented, integrated and tested. They are<br />

available and ready to use.<br />

Figure 44 shows the Scenario Editor. This is a web-based tool to define scenarios,<br />

in which a number of routes to be driven are defined. It provides the possibility to<br />

define the complete test run, including the selection of involved vehicles, adjusted<br />

vehicles’ trajectories, location-based test triggers and the selection of log and<br />

monitoring data. The Test Control provides an instrument to control tests in real-<br />

<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 55<br />

<strong>Final</strong> Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!