<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />
Figure 3 shows the final structure of the COMeSafety Architecture Task Force. <strong>PRE</strong>-<br />
<strong>DRIVE</strong> <strong>C2X</strong> became a member in spring 2009.<br />
Figure 3: Members of the COMeSafety architecture task force<br />
Based on the deliverables D1.2 and D1.4, WP1000 initiated a harmonization<br />
workshop together with the COMeSafety Architecture Task Force. The goal was to<br />
define the further steps towards a common European architecture document. In this<br />
workshop, we achieved the following results:<br />
Both <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> deliverables D1.2 and D1.3 form the basis for the<br />
common architecture document.<br />
All related European projects will contribute to this common architecture<br />
document. The overall goal of this activity is to evolve the common architecture<br />
document towards standardization. Therefore, a common process was<br />
developed and agreed on how to contribute (and to handle) this common<br />
architecture document.<br />
<br />
In order to evolve this document, a couple of teams were established based on<br />
different aspects of the communication architecture. The contributors in these<br />
teams were from the different projects, and the goal was to develop the<br />
respective part in the common document.<br />
In order to consolidate a harmonized European ITS architecture for cooperative<br />
systems, WP1000 has organized two joint workshops with <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong><br />
WP1000 partners and the COMeSafety Architecture Task Force. In both workshops<br />
a process for the consolidation of the architecture documents of <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong><br />
(D1.2 and D1.3) and COMeSafety has been discussed and working groups for<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 4<br />
<strong>Final</strong> Report