<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />
Stakeholder forum<br />
Steering<br />
committee<br />
Project<br />
coordinator<br />
EC<br />
Co-ordination level<br />
EC reviewers<br />
Project management<br />
team<br />
Management level<br />
Work package leaders<br />
Work package level<br />
Figure 64 Project organizational structure<br />
Decisions in the project were always taken on the lowest organisational level<br />
possible. This means from task level to work package level to management level to<br />
coordination level. Only if a local decision and agreement could not be reached it<br />
was escalated to the next higher level, and eventually to the highest project internal<br />
level, the steering committee.<br />
The fact that the Steering Committee comprised of the coordinator, the project<br />
management functions and the work package leaders met once every two months<br />
allowed close monitoring and steering of the project and fast conflict resolution.<br />
4.2 Project steering and controlling<br />
A quarterly work, progress and resource <strong>report</strong>ing ensured that the management<br />
was continuously aware of potential problems and could initiate counter measures<br />
long before a problem got out of control. A web based online <strong>report</strong>ing tool was used<br />
to collect and process data and prepare it for steering purposes.<br />
All but one partners invested the additional work required for <strong>report</strong>ing because<br />
there was a high acceptance of the fact that operational management needs regular<br />
feedback on the work progress in a standardised format.<br />
4.3 Lessons learned<br />
Altogether the project was running smoothly and was well organised.<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 93<br />
<strong>Final</strong> Report