<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />

Stakeholder forum<br />

Steering<br />

committee<br />

Project<br />

coordinator<br />

EC<br />

Co-ordination level<br />

EC reviewers<br />

Project management<br />

team<br />

Management level<br />

Work package leaders<br />

Work package level<br />

Figure 64 Project organizational structure<br />

Decisions in the project were always taken on the lowest organisational level<br />

possible. This means from task level to work package level to management level to<br />

coordination level. Only if a local decision and agreement could not be reached it<br />

was escalated to the next higher level, and eventually to the highest project internal<br />

level, the steering committee.<br />

The fact that the Steering Committee comprised of the coordinator, the project<br />

management functions and the work package leaders met once every two months<br />

allowed close monitoring and steering of the project and fast conflict resolution.<br />

4.2 Project steering and controlling<br />

A quarterly work, progress and resource <strong>report</strong>ing ensured that the management<br />

was continuously aware of potential problems and could initiate counter measures<br />

long before a problem got out of control. A web based online <strong>report</strong>ing tool was used<br />

to collect and process data and prepare it for steering purposes.<br />

All but one partners invested the additional work required for <strong>report</strong>ing because<br />

there was a high acceptance of the fact that operational management needs regular<br />

feedback on the work progress in a standardised format.<br />

4.3 Lessons learned<br />

Altogether the project was running smoothly and was well organised.<br />

<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 93<br />

<strong>Final</strong> Report