PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />
Figure 63: Static Demonstration<br />
2.3.6.3 Contribution to relevant standardisation activities<br />
The contribution done by the <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> project to the relevant<br />
standardization activities is twofold. From one side the partners actively contributed<br />
to the pre-standardization and standardization discussions. On the other side, the<br />
specifications done from the standardization bodies have been used and adopted<br />
from <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> project to prepare the future field operational tests.<br />
In the following part of the document, a description of the activities done by the<br />
project for the standardization is given.<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 80<br />
<strong>Final</strong> Report