13.11.2014 Views

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />

Figure 63: Static Demonstration<br />

2.3.6.3 Contribution to relevant standardisation activities<br />

The contribution done by the <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> project to the relevant<br />

standardization activities is twofold. From one side the partners actively contributed<br />

to the pre-standardization and standardization discussions. On the other side, the<br />

specifications done from the standardization bodies have been used and adopted<br />

from <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> project to prepare the future field operational tests.<br />

In the following part of the document, a description of the activities done by the<br />

project for the standardization is given.<br />

<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 80<br />

<strong>Final</strong> Report

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!