<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />
Figure 66: Human resources per sub project<br />
To achieve the project goals, <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> mobilised about 580 person months<br />
during a 27 months effort. The project volume was 8.5 Mio EUR with a requested<br />
EU funding of about 5.0 Mio EUR. The project thus assembled the required critical<br />
mass for its successful completion.<br />
All in all the use of resources was much in line with the planning. There was a total<br />
deviation of 1.7% after M24. Due to the fact that the final event had to be postponed<br />
and the project was extended by three months, additional resources are required<br />
from partners. This will cause approximately 5% of resources to be overspent by the<br />
end of the project.<br />
4.5 The consortium: List of beneficiaries<br />
Beneficiary<br />
Short<br />
name<br />
Contact name<br />
Coordinates<br />
Daimler AG DAI Matthias Schulze Matthias.m.schulze@daimler.com<br />
AUDI AG AUDI Ingrid Paulus Ingrid.paulus@audi.de<br />
BMW F&T BMW Dr. Timo Kosch Timo.kosch@bmw.de<br />
Centro Ricerche Fiat CRF Luisa Andreone Luisa.andreone@crf.it<br />
Opel GmbH OPEL Harald Berninger Harald.berninger@de.opel.com<br />
Volkswagen AG VW Dr. Gregor Gärtner Gregor.gaertner@volkswagen.de<br />
Volvo Technology<br />
Corporation<br />
Volvo Annika Strömdahl Annika.stromdahl@volvo.com<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 95<br />
<strong>Final</strong> Report