PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
PRE-DRIVE C2X Deliverable D0.3 Final report_20100929.pdf
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Final</strong> Report <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> 29.9.2010<br />
First <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> held on October 24, 2008 at Opel in Rüsselsheim in<br />
combination with the Car 2 Car Communication Consortium Forum and<br />
Demonstration 2008: Potential use cases for <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> were preselected<br />
and prioritised. Around 60 people attended this workshop.<br />
First Joint Workshop of <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> and EasyWay on perspectives of<br />
cooperative systems. The workshop was held in a lifely and friendly atmosphere<br />
and the stakeholders begun drafting a commonly agreed deployment roadmap<br />
for cooperative systems. The workshop was held in Brussels on 25 June, 2009,<br />
hosted by Volvo. Around 80 people attended the workshop.<br />
Second Joint Workshop of <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> and EasyWay to prepare a<br />
deployment roadmap for cooperative systems: Again a lively working together<br />
was experienced, where the stakeholders defined priorities, use cases, and<br />
stakeholder’s roles for the future deployment of cooperative systems. The<br />
workshop was again held in Brussels on 11 June, 2010, hosted by Volvo.<br />
Around 80 people attended the workshop.<br />
<br />
On September 09, 2010, representatives of the <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> and EasyWay<br />
Steering Committees met. They agreed to establish a group of experts who in<br />
the coming period will detail the cooperative systems priorities applications and<br />
services to highlight actors and actions for a sustainable deployment. The<br />
results of the working group will feed a document that is planned to be presented<br />
to the European member states by the EasyWay project. The overall aim is to<br />
guarantee that cooperative systems will be included into the list of core ITS<br />
applications that will be firstly deployed across the whole of Europe.<br />
The <strong>Deliverable</strong>s D6.1 “First Joint Workshop including all relevant stakeholders on<br />
pan-European architecture”, D6.2 “Mid Term Join Workshop including all relevant<br />
stakeholders on pan-European architecture” and D6.3 “<strong>Final</strong> Workshop including all<br />
relevant stakeholders on pan-European architecture” <strong>report</strong> in detail about these<br />
workshops and their outcome.<br />
2.3.6.2 Dissemination of project activities and results to the whole ICT community<br />
Project logo and identity<br />
The <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> project logo was developed here together with a project<br />
corporate identity, which builds on the logo. Templates have been prepared in<br />
Powerpoint and Word for project related presentations and documents.<br />
Figure 57: <strong>PRE</strong>-<strong>DRIVE</strong> <strong>C2X</strong> logo in colour and grey code<br />
<strong>Deliverable</strong> <strong>D0.3</strong> Version 1.0 73<br />
<strong>Final</strong> Report