15.11.2014 Views

Download Tender Document - High Commission of India, Colombo

Download Tender Document - High Commission of India, Colombo

Download Tender Document - High Commission of India, Colombo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MEASURED PRICE CONSTRUCTION CONTRACT<br />

General Conditions<br />

Operational excellence for results that matter<br />

"Particular Conditions" means the particular conditions specified immediately<br />

before the Schedules (if any) to the Contract.<br />

"Party" means the Employer or the Contractor, as the context requires.<br />

"Payment Certificate" means a payment certificate issued under Clause 14<br />

[Contract Price and Payment].<br />

"Permanent Works" means the permanent works to be supplied, constructed,<br />

commissioned, tested and handed over to the Employer by the Contractor when the<br />

Works are Taken Over under the Contract.<br />

"Permitted Subcontractor" means the Subcontractor(s), supplier(s) or categories <strong>of</strong><br />

Subcontractors or suppliers listed in the Schedule <strong>of</strong> Permitted Subcontractors.<br />

"Plant" means the apparatus, machinery and vehicles (other than Materials)<br />

intended to form or forming part <strong>of</strong> the Permanent Works.<br />

"Project" means the project described in the Schedule <strong>of</strong> Details.<br />

"Provisional Sum" means a sum (if any) which is specified in the Schedule <strong>of</strong><br />

Contract Price as a provisional sum, for the execution <strong>of</strong> any part <strong>of</strong> the Works, a<br />

Section or for the supply <strong>of</strong> Plant, Materials or services under Sub-Clause 13.5<br />

[Provisional Sums].<br />

"Punch List" has the meaning given to it at Sub-Clause 10.1 [Taking Over the<br />

Works and Sections].<br />

"Retention Money" means the accumulated retention monies which the Employer<br />

retains under Sub-Clause 14.3 [Application for Interim Payment Certificates] and<br />

pays under Sub-Clause 14.9 [Payment <strong>of</strong> Retention Money].<br />

"Schedule <strong>of</strong> Auxiliary Works" is Schedule 17.<br />

"Schedule <strong>of</strong> Contract Price" is Schedule 7.<br />

"Schedule <strong>of</strong> Details" is Schedule 1.<br />

"Schedule <strong>of</strong> Drawings" is Schedule 4.<br />

"Schedule <strong>of</strong> Environmental Requirements" is Schedule 19.<br />

"Schedule <strong>of</strong> Forms <strong>of</strong> Collateral Warranty" is Schedule 11.<br />

"Schedule <strong>of</strong> Form <strong>of</strong> Subcontractor Side Agreement" is Schedule 12.<br />

"Schedule <strong>of</strong> Forms <strong>of</strong> Certificates" is Schedule 13.<br />

"Schedule <strong>of</strong> Forms <strong>of</strong> Security" is Schedule 6.<br />

"Schedule <strong>of</strong> Health and Safety Requirements" is Schedule 18.<br />

"Schedule <strong>of</strong> Insurance Requirements" is Schedule 14.<br />

© UNOPS 2011 8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!