Development <strong>of</strong> Atchchuvali Industrial<br />

Estate in Jaffna District, Sri Lanka<br />

Specifications – Waste Water Drainage System<br />

• Generators;<br />

• Other equipment <strong>of</strong> dignity. The tests include:<br />

• Visual inspection;<br />

• Measurements;<br />

• Capacities;<br />

• Welding;<br />

• Coating;<br />

• Numbers <strong>of</strong> delivery;<br />

• Noise;<br />

• Vibrations.<br />

10.7.5.5.4 Pumps<br />

All pumps shall be tested after installation as follows:<br />

• Complete with all shaft bearings, thrust bearings<br />

and directly driven auxiliaries or, where this is<br />

impracticable, the Contractor shall state what<br />

allowances shall be made for losses incurred by<br />

these items, and shall demonstrate the accuracy<br />

<strong>of</strong> these allowances to the satisfaction <strong>of</strong> the<br />

Employer.<br />

The pumps shall be tested in the factory <strong>of</strong><br />

origin; test certificates have to be handed over to<br />

the Employer.<br />

The pumps shall be tested under the following<br />

conditions:<br />

a) The pumps shall be driven by their own electric<br />

driven motor.<br />

b) During testing also the power absorbed by the<br />

motor shall be measured.<br />

c) Each required set <strong>of</strong> observations should at<br />

least have observations <strong>of</strong> four duty points <strong>of</strong><br />

each pump. These 4 points are:<br />

• Rated capacity;<br />

• Maximum allowable load capacity;<br />

• Minimum allowable load capacity;<br />

• Zero capacity.<br />

d) In the event that pumps have to operate in<br />

duty-points where the available NPSH<br />

is less than 3 m w c more than the required<br />

NPSH, the required NPSH curve shall<br />

be tested in several extra duty-points.<br />

Archimedean screw pumps will not normally be<br />

July 2012 Page 29