MEASURED PRICE CONSTRUCTION CONTRACT<br />

General Conditions<br />

Operational excellence for results that matter<br />

reasonably considers that there is a risk <strong>of</strong> damage or injury to the Works or<br />

any person. In such case, notification <strong>of</strong> the alteration shall be issued within<br />

48 hours.<br />

(f)<br />

(g)<br />

Nothing in the Contract will be construed to authorise the Contractor to effect<br />

any unilateral change in the execution <strong>of</strong> the Works, the Contract Price and/or<br />

the Contract without the Employer's Representative's prior written approval.<br />

If the Contract specifies, or the Employer's Representative otherwise issues<br />

an instruction in accordance with Sub-Clause 3.3 [Instructions] requiring that<br />

the Contractor shall design any Section or part <strong>of</strong> the Works, then unless<br />

otherwise stated in the Contract:<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

the Contractor shall submit to the Employer's Representative the<br />

Contractor's <strong>Document</strong>s, for this Section or part <strong>of</strong> the Works in<br />

accordance with the Contract, including the procedures specified in<br />

Sub-Clauses 4.1(h) and 4.1(i) and the Specification;<br />

these Contractor's <strong>Document</strong>s shall be in accordance with the<br />

Specification and Drawings, shall be written in English, and shall<br />

include additional information required by the Employer's<br />

Representative to add to the Drawings for co-ordination <strong>of</strong> each<br />

Party's designs;<br />

the Contractor shall be responsible for the design and construction <strong>of</strong><br />

these Sections or parts <strong>of</strong> the Works, which shall, when completed,<br />

be fit for such purposes for which the Sections or parts <strong>of</strong> the Works<br />

are intended as specified in the Contract; and<br />

prior to the commencement <strong>of</strong> the Tests on Completion, the<br />

Contractor shall submit to the Employer's Representative the<br />

Contractor's <strong>Document</strong>s, the "as-built" documents and operation and<br />

maintenance manuals in accordance with the Specification and/or the<br />

Employer's Representatives instructions, and in sufficient detail for the<br />

Employer to operate, maintain, dismantle, reassemble, adjust and<br />

repair this Section or part <strong>of</strong> the Works. Such Sections or parts <strong>of</strong> the<br />

Works shall not be considered to be completed for the purposes <strong>of</strong><br />

being Taken Over under Sub-Clause 10.1 [Taking Over <strong>of</strong> the Works<br />

and Sections] until these documents and manuals have been<br />

submitted to the Employer's Representative.<br />

(h)<br />

When preparing the Contractor's <strong>Document</strong>s in accordance with Sub-Clause<br />

4.1(g), the Contractor shall:<br />

(i)<br />

give the Employer’s Representative, for its review, 4 copies <strong>of</strong>:<br />

the Contractor's <strong>Document</strong>s by the dates, or within the times, set out<br />

in the Contract or as otherwise agreed in writing between the<br />

Parties; and<br />

any amendments proposed to the Contractor's <strong>Document</strong>s; and<br />

© UNOPS 2011 29