15.11.2014 Views

Download Tender Document - High Commission of India, Colombo

Download Tender Document - High Commission of India, Colombo

Download Tender Document - High Commission of India, Colombo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Development <strong>of</strong> Atchchuvali Industrial Estate<br />

Jaffna District, Sri Lanka - Phase 01<br />

<strong>Tender</strong> Issue<br />

Bill No. 07: Sewer Disposal System<br />

Page B7 / 1<br />

BILLS OF QUANTITIES<br />

Bill No 07: Sewer Disposal System<br />

Development <strong>of</strong> Atchchuvali Industrial Estate in Jaffna District, Sri Lanka<br />

CONSTRUCTION OF INFRASTRUCTURE FACILITIES<br />

Item No. Description Qty. Unit<br />

Rate<br />

LKR<br />

Amount<br />

LKR<br />

7P<br />

7P1<br />

SEWER PIPE NETWORK<br />

Ground Work<br />

Examine the areas and conditions under which<br />

site work is performed. Do not proceed with the<br />

work until unsatisfactory conditions are<br />

corrected.<br />

Consult the records and drawings <strong>of</strong> adjacent<br />

work and <strong>of</strong> existing services and utilities which<br />

may affect site work operations.<br />

Coordinate work as needed with other work in<br />

adjacent areas<br />

Excavation trenches for the services including<br />

water supply, waste, sewer, storm water and<br />

Electrical installation are measured elsewhere<br />

Note<br />

Note<br />

Note<br />

Note<br />

(a)<br />

Unless other wise stated, Rate shall include for:<br />

Double handling and disposal <strong>of</strong> surplus<br />

excavated material as directed.<br />

Note<br />

(b) Any additional excavation for working space. Note<br />

() (c)<br />

Dredging, dewatering and disposal <strong>of</strong> surface<br />

water keeping all excavations and other working<br />

areas free from rain / ground water and<br />

percolating water by pumping or otherwise until<br />

completion <strong>of</strong> works.<br />

Note<br />

(d) Upholding sides <strong>of</strong> excavations. Note<br />

(e)<br />

Trimming and preparation <strong>of</strong> excavated surfaces<br />

where necessary.<br />

Note<br />

(f) Disposal <strong>of</strong> excavated material. Note<br />

(g) Filling and backfilling as required. Note<br />

(h) Removal <strong>of</strong> dead services if any. Note<br />

Package 4: Waste and Sewer Disposal System<br />

Sewer Pipe Network

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!