Development <strong>of</strong> Atchchuvali Industrial<br />

Estate in Jaffna District, Sri Lanka<br />

Specifications – Waste Water Drainage System<br />

• Tests results, including any calculations and graphs;<br />

• Inspection findings;<br />

• Other pertinent or relevant details;<br />

• The Contract requirements or the approved design requirements;<br />

and<br />

• Statement <strong>of</strong> compliance or otherwise with Contract<br />

requirements or the requirements <strong>of</strong> the approved design.<br />

10.7.5.4. Inspection and Testing <strong>of</strong> Pipelines<br />

10.7.5.4.1. General<br />

On completion <strong>of</strong> construction, internal surfaces <strong>of</strong><br />

pipelines shall be cleaned thoroughly in such a way as to<br />

remove all oil, grit and other deleterious matter. Before<br />

testing any pipeline, the Contractor shall ensure that it is<br />

anchored adequately and that thrusts from bends,<br />

branch outlets or from the pipeline ends are transmitted<br />

to solid ground or to a suitable temporary anchorage.<br />

Open ends shall be stopped with plugs, caps or blank<br />

flanges properly jointed.<br />

The Contractor shall notify the Engineer at least two<br />

clear workings days beforehand <strong>of</strong> his intention to test<br />

a section <strong>of</strong> pipeline.<br />

10.7.5.4.2. Testing Gravity Pipelines<br />

1. Gravity pipelines laid in open cut shall be tested after<br />

they are jointed and before any concreting or backfilling<br />

is commenced, other than such as may be necessary for<br />

structural stability whilst under test.<br />

2. The pipelines shall be tested by means <strong>of</strong> air and by a<br />

visual examination, in lengths determined by the course<br />

<strong>of</strong> construction, in accordance with a program submitted<br />

by the Contractor and approved by the Engineer.<br />

Generally pipelines will be tested as complete lines or<br />

between manholes. Visual examinations shall be done<br />

by mirror and light, in which case, deviation <strong>of</strong> plus or<br />

minus 20mm, i.e. for 160mm and 200mm pipelines a<br />

75% and 80% clear gauging is required.<br />

3. A further air test as detailed in section 10.7.5.4.2 b)<br />

shall be carried out after the backfilling is complete.<br />

Failure <strong>of</strong> this test may require a water test as detailed in<br />