MEASURED PRICE CONSTRUCTION CONTRACT<br />

General Conditions<br />

Operational excellence for results that matter<br />

(i)<br />

(ii)<br />

(iii)<br />

the part which is used shall be deemed to have been Taken Over as<br />

from the date on which it is used;<br />

the Contractor shall cease to be liable for the care <strong>of</strong> such part as<br />

from this date, when responsibility shall pass to the Employer; and<br />

if requested by the Contractor, the Employer's Representative shall<br />

issue a Taking Over Certificate for this part.<br />

(c)<br />

(d)<br />

(e)<br />

For the avoidance <strong>of</strong> doubt, the Parties agree that use <strong>of</strong> any part <strong>of</strong> the Site<br />

by the Employer as a temporary measure or for reasons attributable to the<br />

acts, omissions, breaches or defaults <strong>of</strong> the Contractor or the Contractor's<br />

Personnel or which is either specified in the Contract or agreed by both<br />

Parties in writing, will not be deemed to have been Taken Over by the<br />

Employer. In such cases, the Contractor shall continue to be responsible for<br />

the care <strong>of</strong> such parts <strong>of</strong> the Works until a Taking Over Certificate is issued to<br />

the Contractor in accordance with this Clause 10.<br />

After the Employer's Representative has issued a Taking Over Certificate for<br />

a part <strong>of</strong> the Works, the Contractor shall be given the earliest opportunity to<br />

take such steps as may be necessary to carry out any outstanding Tests on<br />

Completion. The Contractor shall carry out these Tests on Completion as<br />

soon as practicable before the expiry date <strong>of</strong> the relevant Defects Notification<br />

Period.<br />

If the Contractor incurs Costs as a result <strong>of</strong> the Employer having Taken Over<br />

and/or having used a part <strong>of</strong> the Works, other than as a temporary measure<br />

or for reasons attributable to the acts or omissions <strong>of</strong> the Contractor or which<br />

is either specified in the Contract or agreed by both Parties in writing, the<br />

Contractor shall:<br />

(i)<br />

(ii)<br />

give a Claim Notice to the Employer's Representative; and<br />

be entitled subject to Sub-Clause 20.1 [Contractor's Claims] to<br />

payment <strong>of</strong> any such Costs, which shall be added to the Contract<br />

Price as a Variation.<br />

(f)<br />

(g)<br />

(h)<br />

After receiving the Claim Notice under Sub-Clause 10.2(e), the Employer's<br />

Representative shall proceed in accordance with Sub-Clause 20.1<br />

[Contractor's Claims] and Sub-Clause 3.5 [Determinations] to agree or<br />

determine these Costs.<br />

Where, for reasons attributable to the acts or omissions <strong>of</strong> the Contractor, the<br />

Employer in its absolute discretion elects to issue a Taking Over Certificate or<br />

otherwise uses a part <strong>of</strong> the Works in accordance with this Sub-Clause 10.2,<br />

the Contractor shall not be entitled to any extension <strong>of</strong> time or any increase to<br />

the Contract Price.<br />

If a Taking Over Certificate has been issued for a part <strong>of</strong> the Works (other<br />

than a Section), the Delay Damages thereafter for completion <strong>of</strong> the<br />

remainder <strong>of</strong> the whole <strong>of</strong> the Works shall be reduced. Similarly, the Delay<br />

Damages for the remainder <strong>of</strong> the Section (if any) in which this part is<br />

included shall also be reduced. For any period <strong>of</strong> delay after the date stated<br />