15.11.2014 Views

Download Tender Document - High Commission of India, Colombo

Download Tender Document - High Commission of India, Colombo

Download Tender Document - High Commission of India, Colombo

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Development <strong>of</strong> Atchchuvali Industrial Estate<br />

Jaffna District, Sri Lanka<br />

<strong>Tender</strong> Issue<br />

Bill No. 4A: Preliminaries<br />

Page B4A / 2<br />

Item Description Unit Qty<br />

The <strong>Tender</strong>er shall read, understand and acquaint<br />

himself with the requirements in the conditions <strong>of</strong><br />

contract Parts I & II, General Specification <strong>of</strong> work,<br />

Particular Specifications <strong>of</strong> Work, Instruction to<br />

<strong>Tender</strong>ers, Bidding Data, <strong>Tender</strong> Form, Appendix to<br />

<strong>Tender</strong> and preamble notes. It is the <strong>Tender</strong>er's<br />

responsibility to see that their price includes for<br />

compliance with all the above requirements whether<br />

specifically referred to in the Bills <strong>of</strong> Quantities or<br />

otherwise. Note<br />

Rate<br />

LKR<br />

Amount<br />

LKR<br />

Cost and expenses in connection with providing any<br />

protective netting, fencing, screens, barricades, railing,<br />

walk-ways at site and any other safety precautions to<br />

the required standard, is deemed to be included in the<br />

tender rates unless otherwise measured separately.<br />

Allow for all costs and expenses for complying with the<br />

General Conditions <strong>of</strong> contract and Specification.<br />

Note<br />

Note<br />

Fixed Charges<br />

4A.1 Allow for setting out <strong>of</strong> works on leveled ground, in<br />

accordance with drawings liaise with client to establish<br />

exact boundaries and other written information given<br />

by the Engineer and obtain written approval from the<br />

Relevant Government authorities for setting out, street<br />

and building lines before commencements <strong>of</strong><br />

construction. Also to make and maintain permanent<br />

bench marks <strong>of</strong> the setting out and obtaining the<br />

Certificate <strong>of</strong> Completion (CoC) from the Local<br />

Authority. The checking <strong>of</strong> any setting out or <strong>of</strong> any<br />

line or level by the Engineer shall not in any way<br />

relieve the Contractor <strong>of</strong> his responsibility for the<br />

accuracy there<strong>of</strong>. item 1<br />

4A.2 Provision <strong>of</strong> safety barricades including providing<br />

luminous warning tapes round open trenches, night<br />

lighting, sign boards, providing domed canopy <strong>of</strong><br />

corrugated metal over the parts <strong>of</strong> open trenches,<br />

provision <strong>of</strong> prefabricated walkways across the open<br />

trenches with suitable deck and protective handrails<br />

and any other safety measures as indstructed by the<br />

Employer's Representative. item 1<br />

4A.3 Allow for means <strong>of</strong> necessary noise and dust control<br />

as per the requirement under the Contract and to the<br />

approval by the Employer's Representative.<br />

item 1<br />

4A.4 Allow for providing safety and security for the Works<br />

and material as necessary and as per the requirement<br />

laid under the Contract, to the satisfaction <strong>of</strong> the<br />

Employer. item 1<br />

Page Total Carried to Collection<br />

LKR<br />

Package 4: Sewer Disposal System<br />

Preliminaries

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!