15.11.2014 Views

Download Tender Document - High Commission of India, Colombo

Download Tender Document - High Commission of India, Colombo

Download Tender Document - High Commission of India, Colombo

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Development <strong>of</strong> Atchchuvali Industrial Estate<br />

Jaffna District, Sri Lanka - Phase 01<br />

<strong>Tender</strong> Issue<br />

Bill No. 08: External Work<br />

Page B8 / 2<br />

Item No. Description Qty. Unit<br />

Excavation and Site Clearing<br />

Rate<br />

LKR<br />

Amount<br />

LKR<br />

8P1.1 Allow for site clearing over work area according<br />

to the site plan, including selective removal <strong>of</strong> all<br />

unwanted vegetation, done in consultation with<br />

the Employer's Representative. rate shall include<br />

for grubbing up <strong>of</strong> small trees having girth not<br />

exceeding 500 mm and removal <strong>of</strong> all debris <strong>of</strong>f<br />

site as directed. (Provisional quantity )<br />

25 m²<br />

8P1.2 Removing existing top soil / vegetation ripping<br />

as necessary to loosen any over compaction and<br />

removal <strong>of</strong> any building debris, mortar,<br />

contaminated soil in planting and turfing areas.<br />

(Provisional quantity ) 5 m²<br />

8P2<br />

GROUND PREPARATION<br />

Excavating pits for planting root balled plants<br />

and trees (trees listed separately)<br />

8P2.1 Pits <strong>of</strong> size 0.5m × 0.5m × 0.5m for trees <strong>of</strong><br />

height between 1.0m - 2.5m 75 nr<br />

8P2.22<br />

Pits <strong>of</strong> size 1m × 1m × 1m for trees above 3m<br />

height. 61 nr<br />

8P2.3 General filling over ground in specified areas for<br />

turfing, to a minimum compacted thickness <strong>of</strong><br />

300mm with imported approved quality earth (red<br />

soil) layer, moist and compacted in 150mm<br />

layers, all as specified and to the approval.<br />

(Provisional quantity ) 150 m²<br />

Filling with imported approved quality earth (red<br />

soil) layer, moist and compacted in 150mm<br />

layers, as specified and to the approval, in<br />

following:<br />

8P2.4 In planting pits 65 m³<br />

8P2.5 In planting trough (included in the plant trough<br />

item ) m³ n/a<br />

Top Soil Filling<br />

Supply spreading and compacting in 150mm<br />

layers sandy loam top soil layer (sand : coir dust<br />

: cowdung / compost – 1:1:1) to a minimum<br />

compacted thickness <strong>of</strong> 150mm as specified in<br />

following areas:<br />

8P2.6 In planting pits 79 m²<br />

Page Total Carried to Collection<br />

LKR<br />

Package 4: Waste and Sewer Disposal System<br />

S<strong>of</strong>t Landscaping

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!