15.11.2014 Views

Download Tender Document - High Commission of India, Colombo

Download Tender Document - High Commission of India, Colombo

Download Tender Document - High Commission of India, Colombo

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MEASURED PRICE CONSTRUCTION CONTRACT<br />

General Conditions<br />

Operational excellence for results that matter<br />

17.7 Warranties relating to the Works<br />

Warranties relating to the Works<br />

Without prejudice to any other warranties expressed elsewhere in the Contract, and<br />

despite any inclusion <strong>of</strong> the Employer <strong>Document</strong>s in the Contract (including in the<br />

Specification and the Drawings) or any approval given or withheld by the Employer<br />

under the Contract, the Contractor warrants that:<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

(e)<br />

(f)<br />

(g)<br />

(h)<br />

the Works will be executed with all the skill and care to be expected <strong>of</strong><br />

appropriately qualified and experienced international contractors with<br />

experience in performing works and services <strong>of</strong> a similar size, type, nature,<br />

scope and complexity to the Works and in accordance with Industry Best<br />

Practices;<br />

the Works will be executed in accordance with the Contract, for the Contract<br />

Price, and by the Time for Completion and that it will furnish all parts <strong>of</strong> the<br />

Works and all materials and services necessary to make the Works fully and<br />

operationally complete as specified in the Contract;<br />

when the Works are completed they shall be fit for such purposes for which<br />

the Works are intended as are specified in the Schedule <strong>of</strong> Specification;<br />

the Works will be executed with the highest regard for safety and protection <strong>of</strong><br />

the environment and so that the Works are capable <strong>of</strong> being operated and<br />

utilised in accordance with all applicable Laws and the Contract;<br />

the Works and the Plant and Materials utilise proven technology, being a<br />

technology that has operated commercially at other similar works and which,<br />

as <strong>of</strong> the Date <strong>of</strong> the Contract, is capable <strong>of</strong> being insured on a reasonable<br />

commercial basis;<br />

the Plant and Materials shall, when first used during the performance <strong>of</strong> the<br />

Works, be new and unused and shall also be, in accordance with the<br />

Contract and <strong>of</strong> a quality reasonably expected in the international<br />

construction and design industries, free from material defects and<br />

deficiencies <strong>of</strong> any kind, and free from any encumbrance or Security Interest<br />

and shall conform to the requirements set out in the Contract; and<br />

the Works will comply with all applicable Laws and the requirements <strong>of</strong> all<br />

relevant Authorities at the time the Works are Taken Over; and<br />

the warranties provided under this Sub-Clause 17.7 survive the completion,<br />

termination or expiry <strong>of</strong> the Contract.<br />

© UNOPS 2011 110

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!