MEASURED PRICE CONSTRUCTION CONTRACT<br />

General Conditions<br />

Operational excellence for results that matter<br />

(h) Notwithstanding any other provisions <strong>of</strong> the Contract, no change,<br />

modification, addition or deletion to, in or from the Specification or the<br />

Contractor's <strong>Document</strong>s, the Works or the Contractor's conditions and<br />

methods <strong>of</strong> working, which are necessary due to any act, omission or default<br />

<strong>of</strong> the Contractor in the performance <strong>of</strong> its obligations under the Contract,<br />

shall be deemed to be a Variation and any such matter shall not result in any<br />

adjustment <strong>of</strong> the Contract Price, extension <strong>of</strong> time or other relief. Any<br />

additional Costs to the Employer caused by such change, modification,<br />

addition or deletion which are attributable to such default or breach shall be<br />

borne by the Contractor and may be recovered by the Employer in<br />

accordance with Sub-Clauses 14.7 [Payment] and 14.16 [Set Off].<br />

(i)<br />

(j)<br />

For the avoidance <strong>of</strong> doubt, the Employer and the Employer's Representative<br />

shall have the right to instruct a Variation and the Contractor shall be obliged<br />

to execute such Variation notwithstanding any failure <strong>of</strong> the Parties to agree<br />

on the changes (if any) to the Contract Price, Contract Programme and/or the<br />

Works required as a result <strong>of</strong> such Variation.<br />

No Variation invalidates the Contract. The Contractor agrees that a Variation<br />

may involve the omission <strong>of</strong> any part or parts <strong>of</strong> the Works and the Contractor<br />

agrees that the Employer may engage others to perform that part or parts <strong>of</strong><br />

the Works which have been omitted. The Contractor further acknowledges<br />

that any omission or omissions will not constitute a basis to allege that the<br />

Employer has repudiated the Contract no matter the extent or timing <strong>of</strong> the<br />

omission or omissions.<br />

13.2 Value Engineering<br />

Value Engineering<br />

(a)<br />

The Contractor may, at any time submit to the Employer's Representative a<br />

written proposal which (in the Contractor's opinion) will, if adopted:<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

accelerate completion <strong>of</strong> the Works and/or the Project;<br />

reduce the cost to the Employer <strong>of</strong> executing, maintaining or<br />

operating the Works and/or the Project;<br />

improve the efficiency or value to the Employer <strong>of</strong> the completed<br />

Works and/or the Project; or<br />

otherwise be <strong>of</strong> benefit to the Employer.<br />

(b)<br />

(c)<br />

The proposal shall be prepared at the cost <strong>of</strong> the Contractor and shall include<br />

the items listed in Sub-Clause 13.3 [Variation Procedure].<br />

If a proposal, which is approved by the Employer, includes a change in the<br />

design <strong>of</strong> part <strong>of</strong> the Permanent Works, then unless otherwise agreed by both<br />

Parties:<br />

(i)<br />

(ii)<br />

the Contractor shall design this part;<br />

Sub-Clause 4.1(g) [Contractor’s General Obligations] shall apply; and<br />

© UNOPS 2011 86