MEASURED PRICE CONSTRUCTION CONTRACT<br />

General Conditions<br />

Operational excellence for results that matter<br />

4.25 Assignment and Novation <strong>of</strong> Manufacturer's Warranties<br />

Assignment and Novation <strong>of</strong> Manufacturer's Warranties<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

The Contractor shall procure that any warranty, express or implied, with<br />

respect to any Plant or Materials used in the execution <strong>of</strong> the Works made or<br />

given by the manufacturer, any Subcontractor or supplier there<strong>of</strong>, or any<br />

other seller there<strong>of</strong>, will be made in favour <strong>of</strong> the Employer or will be assigned<br />

or otherwise made available to the Employer or such entity that the Employer<br />

nominates.<br />

The Contractor shall ensure that all warranties referred to in Sub-Clause<br />

4.25(a) given by the manufacturer, any Subcontractor or supplier there<strong>of</strong>, or<br />

any other seller there<strong>of</strong>, will be capable <strong>of</strong> novation from the Employer to any<br />

entity to be nominated by the Employer.<br />

To the extent that the warranties cannot be made in favour <strong>of</strong> the Employer,<br />

assigned or otherwise made available to the Employer, the Contractor agrees<br />

(at its cost) to use its best endeavours to enforce such rights as the<br />

Contractor may have, for the benefit <strong>of</strong> the Employer or its nominee.<br />

The Works shall not be considered to be completed for the purposes <strong>of</strong> being<br />

Taken Over under Sub-Clause 10.1 [Taking Over <strong>of</strong> the Works and Sections]<br />

until the Employer has received such warranties and confirmation that the<br />

warranties are capable <strong>of</strong> novation from the Employer to any entity to be<br />

nominated by the Employer, or if Sub-Clause 4.25(c) applies, the Contractor<br />

has demonstrated to the reasonable satisfaction <strong>of</strong> the Employer that it has<br />

used its best endeavours to enforce such rights as the Contractor may have<br />

for the benefit <strong>of</strong> the Employer.<br />

4.26 Auxiliary Works<br />

Auxiliary Works<br />

(a)<br />

(b)<br />

The Contractor shall ensure that the Works connect to and fully interface with<br />

the Auxiliary Works.<br />

Provided the Auxiliary Works:<br />

(i)<br />

(ii)<br />

perform in the manner specified in the Schedule <strong>of</strong> Auxiliary Works;<br />

and<br />

are completed on or before the later <strong>of</strong> the:<br />

(A)<br />

(B)<br />

dates specified in the Schedule <strong>of</strong> Auxiliary Works; and<br />

date the Contractor can and needs to use the relevant item <strong>of</strong><br />

Auxiliary Works, as assessed by the Employer's<br />

Representative,<br />

the Contractor will have no right to claim any additional costs or an extension<br />

<strong>of</strong> time as a result (directly or indirectly) <strong>of</strong> the impact <strong>of</strong> the Auxiliary Works<br />

on the Works. Any claim the Contractor is entitled to make shall be made<br />

© UNOPS 2011 48