Development <strong>of</strong> Atchchuvali Industrial Estate<br />

Jaffna District, Sri Lanka - Phase 01<br />

<strong>Tender</strong> Issue<br />

Bill No. 07: Sewer Disposal System<br />

Page B7 / 18<br />

Item No. Description Qty. Unit<br />

Excavation<br />

Rate<br />

LKR<br />

Amount<br />

LKR<br />

7S1.1 Allow for site clearing over work area according<br />

to the site plan, including selective removal <strong>of</strong> all<br />

unwanted vegetation, done in consultation with<br />

the Employer's Representative. rate shall include<br />

for grubbing up <strong>of</strong> small trees having girth not<br />

exceeding 500 mm and removal <strong>of</strong> all debris <strong>of</strong>f<br />

site as directed.<br />

7S1.2 Provisional quantity for removing top soil to an<br />

approximate depth not more than 250mm from<br />

existing ground level, including leveling and<br />

removal <strong>of</strong> surplus as directed by the Engineer.<br />

8 m²<br />

8 m²<br />

Excavation in material other than top soil, rock<br />

orartificialhardmaterial material, maximumdepth10to<br />

1.0 to<br />

2.0m commencing from reduced level.<br />

7S1.3 For pump station 44 m³<br />

7S1.4 For panel room bases 0.4 m³<br />

7S1.5 Excavation in rock maximum depth 1.0 to 2.0m<br />

commencing from reduced level. (Provisional<br />

quantity ) 5 m³<br />

Excavation ancillaries<br />

7S1.6 Preparation <strong>of</strong> excavated surfaces 13 m²<br />

7S1.7 Disposal <strong>of</strong> excavated materials on site as<br />

directed by the Engineer. 44 m³<br />

7S1.8 Disposal <strong>of</strong> excavated rock <strong>of</strong>f site as directed by<br />

the Engineer. (Provisional quantity ) 5 m³<br />

7S1.9 Allow provisional amount for disposal <strong>of</strong> surface<br />

water keeping all excavations and other working<br />

areas free from rain / ground water and<br />

percolating water by pumping or otherwise until<br />

completion <strong>of</strong> works. 1 item<br />

Filling<br />

7S1.10 Filling and backfilling to structures, with selected<br />

excavated material other than hard rock or<br />

artificial hard material. (Provisional quantity )<br />

5 m³<br />

Page Total Carried to Collection<br />

LKR<br />

Package 4: Sewer Disposal System<br />

Pump Station