Development <strong>of</strong> Atchchuvali Industrial Estate<br />

Jaffna District, Sri Lanka - Phase 01<br />

<strong>Tender</strong> Issue<br />

Bill No. 07: Sewer Disposal System<br />

Page B7 / 14<br />

Item No. Description Qty. Unit<br />

Rate<br />

LKR<br />

Amount<br />

LKR<br />

7R2<br />

MASONRY WORK<br />

Unless specified otherwise, rate shall include for:<br />

Working under restricted conditions<br />

Lifting, handling, weighting all rough and fair<br />

cutting, plumbing angles, normal straight cutting,<br />

forming rebated reveals and raking out joints <strong>of</strong><br />

plastering<br />

Reinforced concrete vertical and horizontal<br />

stiffeners as and where required.<br />

Note<br />

Note<br />

Note<br />

Random Rubble Masonry Work<br />

7R2.1 Random rubble masonry partition walls, 400mm<br />

thick x 1600mm high, inside the pond, including<br />

necessary screed and foundation work, as per<br />

detail drawings. 150 m²<br />

7R3<br />

PIPEWORK INSIDE POND<br />

Supplying, laying and jointing or fixing in position<br />

PVC pipes, fittings and specials, complete as<br />

shown in drawings and as directed.<br />

Note<br />

Type 600 uPVC Inlet pipe<br />

7R3.1 200mm diameter uPVC pipe, approximate length<br />

1800mm, (length to suit to site conditions)<br />

1 nr<br />

7R3.2 200mm diameter 90° uPVC socketed bend 1 nr<br />

Type 600 uPVC Outlet pipe<br />

7R3.3 200mm diameter uPVC pipe, approximate length<br />

1800mm, (length to suit to site conditions)<br />

1 nr<br />

7R3.4 200mm diameter 90° uPVC socketed bend 1 nr<br />

Page Total Carried to Collection<br />

LKR<br />

Package 4: Sewer Disposal System<br />

Maturation Pond and Effluent Retention Area